说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 试模调整
1)  mould testing
试模调整
1.
This paper probes into frequent happening problems during the procedure of mould testing, which include the protrude and sunken of auto body drawing part, spring back, dimension deviation for flange etc.
探讨了汽车外覆盖件拉伸模、翻边模及成型等典型模具在试模调整时因模具R角不良而造成的冲压件凸凹不平、回弹、翻边(折边)尺寸超差等容易出现的问题,并根据作者与国内外模具厂专家在现场试模调整的多年经验,指出了造成上述现象的理论原因及现场工艺解决方法。
2)  test and adjustment
调试整定
1.
Based on application of three sets of TDK electric controlling devices in Dadougou Mine, the paper deals with constitution, usage, test and adjustment of the devices, and analyzes the distinguish from the KKX system in the GSJ1 controlling theory.
以大同煤矿集团公司大斗沟矿所用3套TK D电控系统的使用、维护情况为据,论述了TK D电控系统各环节的组成、作用及调试整定,分析了其在G SJ1控制原理上与K K X系统的不同之处。
3)  adjustment test
调整试验
1.
The influence of burners on safety and economics of boilers are known after the combustion adjustment tests and burner tilting tests for 2 100 t/h boilers in Shajiao C Power Station,which is referable for guiding the safe and economic operation of boilers.
对沙角C电厂2 100 t/h 锅炉进行燃烧调整试验和燃烧器的摆动试验后, 掌握了燃烧器对锅炉安全和经济性的影响, 这对指导锅炉安全经济运行有一定的参考价值。
2.
The orthogonal experimental method was adopted during adjustment test,the main and secondary sequence effected on spicific output and coal fineness of coal pulverizing system were determined and the optimum operation mode of pulverizers on coal pulverizing system was forecasted.
对其运行方式进行优化,在调整试验中采用正交试验法,确定出影响制粉系统单耗、煤粉细度各个因素的主次顺序,预测磨煤机制粉系统最佳运行方式,根据校核试验的结果,确定了制粉系统磨煤机的最佳运行方式为挡板开度60%,加载力偏置-2。
4)  commissioning test
调整试验
1.
The main technical specifications,characteristics and commissioning tests before put into use of HG-1950/25.
4-YM1型燃煤超临界锅炉主要技术规范、技术特点和试运前的调整试验。
5)  develop flight-test
调整试飞
1.
This paper presents the condition of develop flight-test.
论述了军用飞机新机调整试飞应具备的条件、调整试飞内容、调整试飞目的、调整试飞基础文件、调整试飞应完成的工作、调整试飞结果文件,同时对调整试飞质量、调整试飞效益、新机调整试飞特点和有效开展军用飞机新机调整试飞等问题展开了讨论。
6)  item moderation
试题调整
补充资料:凸模高度调整结构
图1为凸模高度调整结构。凸模的上端面,与滑块接触。滑块右端开有T形槽,容纳螺钉的头部。转动螺钉,则滑块随之移动。由于滑块与上模座以斜面相互接触,而凸模在固定板内是滑动配合,因之凸模在合模方向的位置得以调整,调整后用螺母紧定。


图1  凸模高度调整结构
1-固定板  2-滑块  3-凸模  4-上模座
5-螺钉  6-螺母

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条