说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 时间非等步长
1)  different time steps
时间非等步长
1.
According to the theory of grey system,the different time steps model of GM(1 1)in the pile foundation engineering is established,and a testing method of this model is provided.
根据灰色系统理论 ,首次建立了时间非等步长的桩基工程GM (1 1)模型 ,提出了时间非等步长的桩基工程GM(1 1)模型的检验方法。
2)  equivalent time step method
等效时间步长法
1.
With equivalent time step method,the timetables for dispatching the commuter buses at two starting stations were given,showing that 49 buses were needed and they had to be dispatched for 440 times.
采用了时间步长法、等效法以及二者结合的等效时间步长法三种方法求解模型。
3)  unequal step
非等步长
1.
Through the data processing, the unequal step observation sequence for deformation monitoring on the soft ground of expressway is transferred to equal step sequence.
通过对高速公路软土地基沉降变形监测的非等步长观测序列进行数据处理后,变成等步长的数据序列,运用GM(1,1)模型进行变形分析与预报,得出了有益的结论。
2.
Through the data processing, the unequal step observation sequence for expressway deformation monitoring is transferred to equal step sequence.
通过对高速公路变形监测的非等步长观测序列进行数据处理后 ,变成等步长的数据序列 ,运用GM( 1,1)模型进行变形分析与预报 ,得出了有益的结
4)  Time step
时间步长
1.
Influence of time step on the calculated melting point of Cu;
时间步长对铜平衡熔点模拟计算结果的影响
2.
Practical Algorithm for Time Step in Low Pressure Die Casting Solidification Simulation;
低压铸造凝固模拟中时间步长的实用算法
3.
Time step is calculated by considering the heat conduction,convection and radiation based on the conservation of energy.
为了尽可能缩短铸件凝固模拟的计算时间,从不同的角度对凝固模拟求解中的时间步长的计算进行了分析;并根据能量守恒原理,在考虑热传导、对流、辐射情况下进行了时间步长的推算,得出了差分网格单元在不同条件、不同位置的实用时间步长计算公式。
5)  anisochronous
非等时同步
6)  time step
时步;时间步长 TS
补充资料:执有法与有等性非一非异
【执有法与有等性非一非异】
  谓外道执法与性其体非同非不同,故云非一非异。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条