说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 卷铁芯
1)  roll-core
卷铁芯
1.
The theory of a roll-core transformer and some related knowledge are introduced briefly.
简要介绍了卷铁芯变压器的设计原理和一些相关的基本知识 ,主要介绍了一种比较理想的三角形结构的变压器卷铁芯设计方法 ,以及采用这种设计方法的原理 ,并且给出了相关的基本算法。
2.
This topic is proceed based on the "Research of key technology of the new type economy transformer with triangle configuration round section Roll-core".
第三,设计了基于Web Service的节能变压器网络化制造系统的实现方案,将卷铁芯设计、卷铁芯生产和生产。
2)  triangle winding iron core
三角形卷铁芯
3)  transformer with roll-core
卷铁芯变压器
1.
The whole frame of the scheduling system for the job shop scheduling of transformer with roll-core network manufacturing system is provided.
针对卷铁芯变压器网络化制造车间的调度问题,给出了调度系统的整体框架,将这个网络化制造系统分为两层调度体系。
4)  round section Roll-core
圆截面卷铁芯
1.
The "Research of key technology of the new type economy transformer with triangle configuration round section Roll-core" is an important project of shanghai science and technology committee.
对称三角形结构的圆截面卷铁芯三相输配电变压器,是近几年才开发出来的新型节能配电变压器,它的卷铁芯设计与制造技术需要进一步的研究开发和完善。
5)  cut-wound core
连续带绕铁芯,卷铁芯(变压器的)
6)  dry scroll ferrous core transformer
卷铁芯干式配电变压器
补充资料:Z8612热芯盒射芯机操作规程
1、遵守铸造设备通用操作规程。
2、工作前还必须遵守:
a、
检查设备上行程开关和碰块的位置是否正确,如不正确,必须调整。
b、
接通电源,打开压缩空气伐门,先用手动方法,对各机构逐进行点动试车,然后用自动方法,进行一个循环试车,确认一切正常后,方可进行生产。
3、工作中还必须遵守:
a、
在设备开动后,一个循环未完成时,不许中途调整电器,以免发生误动作,造成设备人身事故;
b、
设备的每一个循环后,必须用喷咀清除芯盒上残存的砂子,并喷涂分型剂;
c、
在未切断电源和所气源前,不准将手伸入芯盒和夹紧器之间的空隙处,或把手放在导轨上,以免发生人身事故。
d、 一般不准空射,如必须空射,一定要把压缩空气伐门关小;
e、 如果用手操作,不准同时操作两个电器开关。
4、工作后还必须遵守:
a、
操纵各个电器开关,使设备各机构恢复到原始位置,然后切断电源和气源;
b、 折下射砂头,清理积砂和粘砂;
c、 清除排气塞内的粘砂;
d、
取下射砂筒,清除缝隙中的粘砂,最后用石蜡涂擦内壁,但不要将缝隙堵塞;
e、 清除闸板上的积砂,并在闸板上涂石墨粉,以减少磨擦;
f、 清除导轨和导杆上的积灰和积砂,并涂上一层润滑油。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条