说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 组合连梁
1)  composite coupling beams
组合连梁
1.
New structural control system of composite coupling beams;
新型组合连梁控制结构体系
2.
To study the dynamic behavior of a new type of composite coupling beam under elastic stage,tests of model with a traditional reinforced concrete coupling beams,a steel coupling beams and a new type of composite coupling beams were carried out.
对分别采用钢筋混凝土连梁、钢连梁与新型组合连梁的高层建筑结构进行对比,采用ANSYS软件建立试验模型,进行模拟试验,研究新型组合连梁对结构动力性能-自振频率的影响。
3.
This paper has mainly investigated dynamic performance about decreasing seismic effecting of innovative composite coupling beams, which contains control member with friction dissipater.
本文研究的组合连梁控制结构,是一种新的结构体系。
2)  continuous composite beam
连续组合梁
1.
Artificial neural net and its application in continuous composite beam;
人工神经网络在连续组合梁中的应用
2.
The strength and stiffness of continuous composite beams with stiffened web are investigated.
研究了加肋腹板连续组合梁的横向连接刚度和强度。
3.
Local stability and lateral stability are two key factors that dominate the loadcarrying capacity of continuous composite beams.
连续组合梁的局部失稳和侧向失稳是影响承载能力的重要因素 ,我国现行设计规范对组合梁的稳定计算主要沿用钢结构梁的设计方法 ,与组合梁实际失隐情况不符。
3)  continuous composite beams
连续组合梁
1.
A nonlinear model is presented using ANSYS software to analysis the whole process from loading to fracture of the steel-high strength concrete continuous composite beams in view of the complexity of the beam structure and forces acting on them especially the nonlinearity of the materials used.
采用ANSYS通用有限元软件,针对钢与高强混凝土连续组合梁本身结构及受力性能的复杂性,考虑材料非线性,提出了一个对钢与高强混凝土连续组合梁从加载到破坏的全过程非线性分析模式,对钢与高强混凝土连续组合梁连接件设计进行分析。
2.
Local buckling of continuous composite beams with non compact section is investigated.
研究了负弯矩区截面未完全塑性时出现局部失稳的连续组合梁的稳定。
3.
According to the experiment of seven continuous composite beams and some data which was related to it,the reason lead to longitudinal cracking in continuous composite beams and the principal infiuence of it were analysed in this paper.
根据 7根连续组合梁的试验研究结果和有关资料 ,详细分析了连续组合梁纵向开裂的原因及主要影响因素。
4)  continued composite beam
组合连续梁
1.
In the paper,the theory and application of continued composite beam is discussed also.
采用 Z 型筋为抗剪连接件的组合梁在厂房楼层的不同区域采用了不同的设计和计算方法,并对组合连续梁的理论进行了探讨和应用。
5)  Continuous composite two-girder bridge
连续组合双肋梁
6)  T-shaped continuous built-up beam
T型连续组合梁
1.
The article studies the simply-supported-and-continued-later construction of the T-shaped continuous built-up beam,typically resolve the load bearing question of the simple beam when the T-shaped continuous beam followed the nose girder is transferred into place.
文章研究了T型连续组合梁先简支后连续的施工技术,解决了一孔吊装完后,导梁前移及随后的T型连续组合梁运进过程中,简支梁不能承受施工荷载的问题。
补充资料:140t/h梁底组合步进式加热炉(上海第二钢铁厂)


140t/h梁底组合步进式加热炉(上海第二钢铁厂)


  、护‘:一步进式力口热霹
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条