说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 洪石岩水电站
1)  Hongshiyan Hydropower Station
洪石岩水电站
1.
Analysis on stability of back side slope of powerhouse for Hongshiyan Hydropower Station;
洪石岩水电站厂房后边坡稳定性分析
2)  Hongshiyan Hydropower Station
红石岩水电站
1.
Test study on the movable-bed model for Hongshiyan Hydropower Station;
红石岩水电站工程动床模型试验研究
3)  Hongkou hydropower station
洪口水电站
1.
Application of new technology of lean cemented aggregate in Hongkou Hydropower Station construction;
贫胶粗粒料筑坝新技术在洪口水电站的设计与实施
2.
Based on the scheduled construction progress of the RCC dam in Hongkou hydropower station,numerical simulation is used to simulate and calculate temperature field and stress field during construction and operation stages of the RCC dam.
根据洪口水电站碾压混凝土大坝的施工进度,进行了大坝施工期和运行期的温度场和应力场的仿真计算,讨论了坝体设置诱导缝和永久横缝的优劣,分析可能产生裂缝的原因及提出相应的温控防裂措施。
4)  Liuhong Hydropower Station
柳洪水电站
1.
Inquiring into sediment flushing measures and operating mode of Liuhong Hydropower Station;
对柳洪水电站泄洪冲沙措施及运行方式的探讨
2.
Discussion on stability treatment method for accumulation body on left bank of reservoir for Liuhong Hydropower Station;
柳洪水电站库区左岸堆积体稳定处理方法探讨
3.
The Research and Practice of Excavation Construction Technology for Long Inclined-shaft of Liuhong Hydropower Station;
柳洪水电站长斜井开挖施工技术研究与实践
5)  Jinghong Hydropower Station
景洪水电站
1.
Primary Electrical Design for Jinghong Hydropower Station;
景洪水电站电气一次设计
2.
Field Processing of the Turbine s Stay Ring for Jinghong Hydropower Station;
景洪水电站水轮机座环现场加工
3.
The Field Manufacturing of Turbine Runner for Jinghong Hydropower Station;
景洪水电站水轮机转轮的现场制作
6)  Hongmen hydropower station
洪门水电站
1.
Treatment for cracks on piers of the spillway at Hongmen hydropower station;
洪门水电站溢洪道闸墩裂缝处理
2.
Sludge from drain hole of drainage gallery at the spillway foundation of Hongmen hydropower station;
洪门水电站溢洪道基础排水廊道排水孔析出物分析
3.
This paper analysed the measured data by piezometer tubes at the main dam foundation fault F11 of Hongmen hydropower station in aspects such as water level, gradient, potential, rope kit picture and so on, which indicated that the effect of anti-seepage curtain was declined, the F11 fault had been in erosion and its operation performance was deteriorated gradually.
对洪门水电站主坝坝基F11断层测压管资料从水位、坡降、位势、绳套图等方面进行了分析,结果表明帷幕防渗作用在减退,F11断层已受到冲蚀,运行性态正在逐步恶化,并提出应尽早进行补强灌浆的处理措施,保障大坝安全运行。
补充资料:小洪纳海石人

草原石人在昭苏境内分布较多。小洪纳海石人在昭苏县城东南5公里草原上,系隋唐时突厥游牧民族的的墓前石人,高230厘米,头宽35厘米,宽身50厘米,面东而立,双手抱置胸前,右手似执有硫、盏之类东西,头发多辫,分技在身后,腰间刻有古代民族文字。刻工古拙。

最有名的是小洪纳海的女石人,立于昭苏县城东南5公里的草原中。婷婷玉立,造型优美。有多条长发辫披垂在身后,下部还刻有文字。

草原石人在巴里坤、温泉县和伊犁河谷各草原均有发现,总数在100尊以上。石人是古突厥人墓前的标志。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条