1)  Earth creep hole
塌方孔
2)  hole collapse
塌孔
1.
In foundation construction of tested pile in Nanhu,Wuchang,it is hard to drill on account of cracks and karst caves existing in this stratum,which cause slurry leakage and outflow,concrete loss even hole collapses of several piles in construction.
在武昌南湖某钻孔桩基础工程试桩施工过程中,由于该地层存有裂隙、溶洞,个别试桩在施工时出现泥浆渗漏、流失、混凝土流失,甚至塌孔,根本无法成桩。
2.
This paper presents the problem of bored pile hole collapse occurring in one bridge at high elevation area,analyzes the reason of hole collapse,at the same time some settlements measures are proposed.
针对高海拔地区某桥钻孔灌注桩发生的塌孔现象,详细分析了造成塌孔的原因,最后提出了具体的处理方案。
3.
On the basis of the experiences f rom bored pile construction in lan-xu super-way , this paper analyzes the reasons of hole collapse accidents of bored pile construction,and some advice is provided.
根据兰许高速公路钻孔灌注桩施工经验,分析了塌孔问题的原因,并提出了解决方案,提出了解决塌孔事故的建议。
3)  collapse [英][kə'læps]  [美][kə'læps]
塌孔
1.
It analyzes causes on generating quality deficiency of drilling-grouting pile from burying pipe、clipping pipe、water seepage of conduit and collapse and introduces relative prevention measures and its treatment,which to ensure quality of grouting pile and prevent various accidents.
从埋管、卡管、导管进水、塌孔等方面分析了产生钻孔灌注桩质量缺陷的原因,并介绍了相应的防治处理措施,以保证灌注桩的质量,防止各种事故的发生。
2.
This paper describes the remedial works adopted for soil collapsed during bored pile excavation for the advance contract for route 5 section between Shek Wai Kok & Chai Wan Kok in Hong Kong.
主要介绍在香港五号干线前期工程石围角至柴湾角段的灌注桩桩墙施工中的塌孔事故的处
4)  hole collapsing
塌孔
1.
Combined with practical work, from hole collapsing, borehole deviation and other aspects the common problems encountered in construction process of cast-in-place bored pile are analyzed; at the same time corresponding treatment measures are proposed as well as the points for attention in construction to ensure engineering quality.
结合具体的工程事例,从塌孔、钻孔偏斜、溶洞等方面对钻孔灌注桩施工中常见的问题作了分析,并提出进行钻孔灌注桩施工时应注意的事项及出现问题后应采取的处理措施。
2.
According to the quality problems encountered in construction process, such as hole collapsing, plugging and borehole deviation their causing reasons are analyzed; at the same time corresponding quality control measures are proposed.
介绍了嵌岩钻孔灌注桩的作用原理及主要特点,针对施工过程中塌孔、钻孔偏斜、导管堵塞等常见的质量问题,对其原因作了分析,提出相应的质量控制措施。
3.
Combined with several years’ construction experiences according to the hole collapsing, jamming event, broken pile and other failures encountered in cast in site bored pile construction their causing reasons are analyzed; at the same time corresponding treatment measures are presented.
结合多年施工经验 ,就钻孔灌注桩施工中塌孔、卡钻、掉钻、卡导管、堵导管及断桩等情况 ,分析探讨了其成因 ,并提出了具体的方法及处理措
5)  slumped hole
塌孔
1.
According to common problems on spiral excavation drilled-pouring pile,including deviation of pile、declivity of hole、slumped hole, it analyzes reasons and puts forward relative prevention measures.
针对桩位偏移、桩孔倾斜、塌孔等旋挖钻孔混凝土灌注桩常见的质量问题,就其产生的原因进行了分析,并提出相应的预防措施和处理办法。