说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 施工顺序优化
1)  optimization of construction order
施工顺序优化
2)  lining of the proposed order optimization
衬砌施工顺序建议优化
3)  optimum construction sequence
最优施工顺序
4)  optimum operation sequence
加工顺序优化
5)  construction sequence
施工顺序
1.
Soil displacements around jacked group piles based on construction sequence and compacting effects;
考虑施工顺序及遮栏效应的静压群桩挤土位移场研究
2.
Excavation scheme and construction sequence of double-arch tunnel under worse geological conditions;
较差地质连拱隧道开挖方案及施工顺序的探索
3.
The technical economy comparison for construction sequence based on soil excavation and pipe piles in soft soil region
软土地区某基坑挖土与管桩施工顺序的技术经济比较
6)  construction order
施工顺序
1.
In the process,it is found that the construction order in the modeling process has a important effect on the state of the accomplished bridge.
计算发现,有限元模型中的施工顺序对成桥状态有着很大影响,应通过单元生死技术进行施工模拟。
2.
Project difficulties,construction conditions and construction order of steel structure are proposed.
指出工程难点和施工条件、钢结构施工顺序。
补充资料:施工综合进度优化


施工综合进度优化
optimization for overall schedule of construction

shlgong Zonghe jlndU youhuo施工综合进度优化(optimization for overallschedule of eonstruetion)对施工中的相关因素进行多方案比较和优选,找出最佳的进度方案并予以实施的工作。最佳的进度方案应是工期、资源利用、工程造价等方面综合考虑最优的方案。优化的方法包括工期优化法、资源优化法、成本优化法等. 工期优化法在合理利用人力、物力、财力、资源的前提下,尽量缩短关键路径所需的时间。可以采取提高机械化程度等先进施工方法,以及采用近饱和密度的施工组织措施等.近饱和密度的施工,是按流水施工的原理确定工艺参数、空间参数和时间参数,使多工种、多工序相互穿插,紧密衔接,充分利用施工场地,尽量减少施工中的停歇时间,以加快施工进度。 资源优化法在力求减少资源投人的条件下满足工期要求。有两种优化方法:①资源已定,力求工期最短;②工期已定,力求资源投人最少。 成本优化法寻找工程总成本(或工程总造价)最低的最短工期。具体方法是:将工程的直接费(随工期压缩所需增加的机械购置和使用费用、材料费用、临建费等)与工期延长所需增大的间接费进行比较,并计算工程提前投产后的发电效益等诸多因素。优化的结果,使工程成本最低,工期最短。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条