说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 施工放样图
1)  working layout drawing
施工放样图
2)  setting-out survey
施工放样
1.
This article unifies the examples to introduce the application of AutoCAD technology for the material computation and the setting-out survey in the project survey.
结合实例介绍AutoCAD技术在工程测量中内业资料计算及施工放样测量中的应用。
3)  construction setting-out
施工放样
1.
Laying off curve is the primary content of the technique design and construction setting-out in the linear engineering,for instance highway、railway、pieline and so on,and it is the primary competent of engineering surveyor in everyday work.
曲线测设是公路、铁路、管线等线状工程技术设计、施工放样的主要内容之一,是工程测量人员日常工作的主要组成部分,曲线放样数据计算的方法多种多样,本文主要讨论曲线放样数据计算的几种常用方法,并比较其特点及各自适用条件。
2.
Taking the control network of Zhanghewan Pumped Storage Power Station for example,the comparative calculation is made;and the construction setting-out and measurement method for the complex form and structure with multi.
讨论了多线型、多曲面复杂形体的施工放样和计量方法。
3.
After the application of GPS static survey and total-station instrument in the construction setting-out of bridge in Hangzhou gulf,it can be concluded that this method can guarantee the speech and accur.
由于海上施工放样的特殊性,在针对远洋工程施工的特点和技术要求的基础上,进行了施工放样方案选择和精度分析。
4)  construction lofting
施工放样
1.
Discussion on the truncated cone banking construction lofting and quantity calculation;
锥坡施工放样与工程量计算的探讨
2.
It is important that useing the total station instrument to intravers servey, topographic servey, construction lofting and so on.
如发挥全站仪的优势,在导线测量、地形测量、施工放样诸方面可起到非常好的作用,其应用前景是很可观的。
5)  construction setting out
施工放样
1.
The paper presents the contents,methods and feature of the construction setting out for highrise span road in city.
介绍城市高架道路施工放样的内容、方法及特点,依据工程实施经验和对施工测量的研究,研制开发了一套集数据管理、计算及图形绘制等功能为一体的应用软件,本软件具有较高的实用价
2.
Then proceed to discuss a new method of gradual bending sector construction setting out through electronic total station directed prism moving.
通过分析小浪底工程孔板洞下弯段圆心以及各断面半径的变化规律,建立了弯曲段数学模型,编写了卡西欧fx-4500p计算程序,计算出断面理论点半径和断面实测点半径的差距,进而探讨了利用电子全站仪指挥棱镜移动就位进行渐变段施工放样的新方法。
6)  construction layout
施工放样
1.
The papor first introduces the key application of General Total Station,then emphatically expounds the method and formula of coordinate calculation of road central line,grade separation turn-to-turn central line,abutment central point and axial point of reference Thus the concrete operation of General Total Staion in highway construction layout is clarifie
首先介绍全站仪的基本含义 ,提出了全站仪应用于公路施工放样的关键 ,着重论述道路中线桩坐标、道路立交匝道中线桩坐标及桥墩、台中心和桥涵轴线控制桩坐标计算方法 ,并给出了计算公式。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条