说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 间接工时定额
1)  indirect man-hour quota
间接工时定额
1.
This essay introduces the concept of indirect man-hour quota, the methed to calculate indirect man-hour quota and the experiences of application of indimet man-hour quota assessment.
提出了间接工时定额的概念,介绍了质量检查人员间接工时定额的计算方法以及在质检人员中推行间接工时定额考核的经验。
2)  welder-hour quota
焊接工时定额
3)  manufacture time-quota
加工时间定额
4)  Time quota
时间定额
1.
Basis on analyzing the relation between production and time quota, taking TS140 bulldozer as exam-ple,this paper provided reference for the engineers to make up construction organization design.
TS140推土机为例着重分析产量定额与时间定额的关系,为工程技术人员编制施工组织设计提供参考。
5)  Time-quota
时间定额
1.
Multi-agent Based Approach for Determination of Time-quota in Integrated Environment;
集成环境中基于多Agent的时间定额确定方法
6)  normal time,rated time
额定时间
补充资料:建筑安装工程间接费定额


建筑安装工程间接费定额
quota of indirect fee norm of construction and installation

j旧nZhu anZhuang gongeheng」ianiiefei dinge睡筑安装工程l’N接费定额(quota of indireetfee norm of eonstruetion and installation)施工企业为组织和管理工程施工所发生的各项费用的计取标准。它与建筑安装工程预算定额配套使用,是编制工程预算和工程结算的依据。建筑安装工程间接费定额一般分为通用、专业通用和专业专用三类。在中国,间接费定额由国家及地方主管部门规定,具有法令性质,执行中一般不允许任意改变。 组成间接费定额由施工管理费用标准和其它间接费用标准两部分组成。施工管理费包括:(l)管理人员工资;(2)工资附加费;(3)工作人员劳动保护费;(4)职工教育经费;(5)办公费;(6)差旅交通费;(7)固定资产使用费;(8)行政工具用具使用费;(9)利息;(10)其他费用。其它间接费用包括:(1)临时设施费;(2)劳动保险基金等。 计算基数施工管理费费率的计算基数因构成工程结构的物化劳动与活劳动的比重不同而不同,一般分为两类:建筑工程多以直接费为计算基数;安装工程和人工施工的大规模土石厅工程多以直接费中的人工费为计算基数,也有采用人工费和机械使用费作为计算基数的。其它间接费各项费率因内容各异,其计算方法不尽相同。临时设施费费率应先根据施工现场必要的生产性和生活性临时设施确定费用范围,然后选择若干个不同规模的工程项目确定临时设施平均数量、造价和实用年限,并与在此期间内平均完成的工程直接费相比较计算而得。某些工程项目因条件特殊,经发包、承包双方协商同意,可以根据实际需要或按施工平面图确定的临时设施和费用单独结算。劳保支出费费率是根据国家劳保条例规定的企业离退休人员和6个月以上长期病员的费用支出与工程造价或直接费相比而测定的。 编制步骤:包括:确定计算费用定额的基础资料项目和指标;划分费用项目;提出计算公式;计算分项费用额及费率。 (韩杰李宵阳)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条