1)  sand foundation
砂基床
1.
To counter the technical problems met in Fuzhou Huaneng Power Plant 2nd- phase coal terminal engineering such as deep- trench rubble filling, artificial sand foundation, precast and installation of large case box, as well as inner embedding of large reinforced concrete pipe piles, etc.
福州华能电厂二期煤码头施工中遇到了深槽抛石、人工砂基床、大型套箱预制安装、钢筋混凝土大管桩内嵌岩等技术问题。
2)  The vibroreplacement density project
换砂基床
3)  sand foundation
砂基
1.
This paper expounds the key parts of the construction technique and quality control according to the compress construction of grit and gravel mat and sand foundation on the lining channel bed.
本文通过新疆沙漠渠道衬砌渠床砂砾石料垫层和其下砂基的压实施工案例,详细叙述了渠床砂砾石料垫层和砂基水平同起碾压特殊有效的施工工艺及质量控制关键点。
2.
The paper introduces the application of vibro-jet in vibrating compaction of sand foundation.
介绍振动水冲法在砂基振实中的应用,通过振冲前后标准贯入试验数据对比,可见振冲法的应用效果。
4)  foundation with replacement fill sand
换砂基础
5)  saturated sand ground
饱和砂基
6)  sand foundation
砂基础
1.
Based on an analysis on the lithologic character of gate site strata, high pressure gunite technique is adopted for the construction of pile foundation with large diameter, so as to improve the foundation bearing capacity of quay wall sand foundation at both sides of tide gates.
介绍了大风江调水工程中的东场挡潮闸工程的基础及工程地质情况,分析了闸址地层岩性,提出了采用高压喷射灌浆技术形成较大直径桩基,提高挡潮闸两岸岸墙砂基础的地基承载力,并详细论述了高喷桩的设计、施工和质量控制。
参考词条
补充资料:422落砂床操作规程
1、遵守铸造设备通用操作规程
2、检查落砂栅板有无震裂、缓冲器橡皮垫有无磨损等情况,如有以上情况,应通知维修人员处理。
3、检查三角皮带的松紧与磨损情况,如过紧过松、或磨损严重,应通知维修人员调整或更换。
4、先点动试车,然后空运转2-3分钟,确认一切正常,方可进行生产。
5、必须将铸件吊到落砂床中心位置,才能进行落砂。
6、经常清除调和周围的积砂,做到文明生产。
7、工作后,不许将铸件停放在设备上。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。