您的位置:首页 -> 词典 -> 前期准备工程
1)  primary preparation works
前期准备工程
1.
The estimated investment of primary preparation works of Baishi Reservoir in Liaoning Province is 172.
辽宁省白石水库前期准备工程概算总投资 172 44万元 。
2)  engineering preparation
工程准备
1.
On basis of case histories of sub-sea tunnels and sub-water tunnels in China and foreign countries,the author makes some comments on sub-sea tunnels in respect of engineering preparations,technical methods,option selection,risk management and engineering concept.
结合国内外海底及水下隧道建设的实例,从海底隧道的工程准备、技术方法、方案比选、风险管理、工程理念等方面进行论述。
3)  preliminary works
准备工程
4)  prophase construction
前期工程
1.
Quality management of prophase construction of Laxiwa Project--Discuss on management under the new structure of construction teams;
拉西瓦前期工程施工质量管理——由水电施工队伍的结构变化对新形势下管理的初探
5)  pre-construction preparation
施工前准备
6)  construction preparatory stage
施工准备期
1.
From the point of view of supervion,this paper anticipates the rationalization and stabilization of construction schedule provided by contractor in construction preparatory stage, and the consequences caused by an accident, then gives some advises to solve.
围绕这一问题 ,从监理单位的角度对施工准备期承包商提交的施工进度计划的合理性、预测施工进度计划的稳定性 ,以及意外事件发生的可能后果进行探讨 ,并提出相应的处理措
补充资料:前期工程


前期工程


[前期工程]房屋建筑工程施工开工以前的一切准备工作,也包括拆迁。因为拆迁工作很复杂,政策性很强,一般把拆迁工作除外,所有开工以前的工作叫前期工程。一般称为“三通一平”,也有称为“七通一平”的。征用土地在红线内拆除地上物后,还应对地下进行调查、了解。对地下文物、古墓、管道、电缆、防空洞和其他地下物等,要按各有关规定进行地下物的清除。如不能清除的也要在设计时考虑采取处理措施。场地拆清后,按规划设计的标高进行场地平整,并按设计要求将上水、污水、雨水、电缆、暖气、煤气、通讯电缆和道路等铺设到红线或红线以内。自来水、污水、雨水、电、暖、煤气、通讯等在规划设计时应征得当地有关部门的意见,商量妥当,并要求这些部门签字认可,签订好合同后,再正式出图。施工单位按照施工程序,按图施工。对于高层建筑来说,地基部分的建筑物埋置较深,所以在前期工程中更要合理安排。“三通一平”或“七通一平”完成后,土地开发才算完成。