1)  Guangzhou Pumped Storage Power Station Phase Ⅱ
广州抽水蓄能电站二期工程
2)  Guangzhou Pumped-storage Power Plant
广州抽水蓄能电站
1.
Economic Dispatching Strategies and its Operating Experience of Guangzhou Pumped-storage Power Plant;
广州抽水蓄能电站机组经济调度及运用经验
2.
Fundtions or Guangzhou Pumped-storage Power Plant in Guangdong Power Network and its Economic Analysis;
广州抽水蓄能电站在广东电网中的作用及经济性分析
3)  Guangzhou Pumped Storage Station
广州抽水蓄能电站
1.
Analysis on Dam s Displacement of Guangzhou Pumped Storage Station;
广州抽水蓄能电站大坝位移监测成果分析
2.
This paper presents the arrangement of drainage system for high pressure tunnels, high pressure bifurcations and high pressure diversion penstocks of stage I Project of Guangzhou Pumped Storage Station and the results after filling test.
本文介绍广州抽水蓄能电站一期工程高压隧洞、高压岔管及高压引水钢支管的排水系统布置及其充水试验后的效果。
4)  Guangzhou Pumped Storage Plant
广州抽水蓄能电站
1.
On the basis of using the successful experience of the first-stage project for reference and the actual measurement data, the second-stage project of the Guangzhou Pumped Storage Plant adopts the principles and methods of pervious lining tunnel to conduct the structural design of high-pressure tunnel for the second-stage project.
广州抽水蓄能电站二期工程 ,在充分借鉴一期工程的成功经验和实测资料的基础上 ,采用透水衬砌隧洞的原理和方法 ,对二期工程高压隧洞进行结构设计。
2.
The whole project of the Guangzhou Pumped Storage Plant with the installed capacity of 2400 MW was completed and put into operation in March 2000, which is the largest pumped storage station in installed capacity in the world at present.
装机容量为 2 4 0万kW的广州抽水蓄能电站已于 2 0 0 0年 3月全部建成投产 ,它是当今世界上装机规模最大的抽水蓄能电站。
5)  stage Ⅱ project of Guangzhou Pumped Storage Station
广蓄电站二期工程
6)  pumping energy storage power station project
抽水蓄能电站工程
1.
Method of soil conservation monitoring of pumping energy storage power station project in Huizhou;
惠州抽水蓄能电站工程水土保持监测内容和方法
补充资料:广州抽水蓄能电站
广州抽水蓄能电站

    中国第一座大型抽水蓄能电站。位于广东省从化市黄竹。原为广东省第一座中型水电站,建于1958年8月,总装机容量4.2万千瓦。为配合深圳大亚湾核电站的建设,决定将其改建为抽水蓄能电站,以总库容3.26亿立方米的流溪河水库为调节水库,电站新装机容量120万千瓦,利用大亚湾核电站夜间多余的电力抽水蓄能,白天发电。电站主体工程1990年8月开工,1994年完成。