1) Huilong Pumped Storage Power Station
回龙抽水蓄能电站
1.
Seepage calculation for upper reservoir of Huilong Pumped Storage Power Station and new technique for seepage control;
回龙抽水蓄能电站上库渗流模拟计算与防渗新工艺
3) Xilongchi Pumped-storage Hydropower Station
西龙池抽水蓄电能电站
5) Xilongchi pumped-storage power station
西龙池抽水蓄能电站
1.
Control blasting technology for high sideslope of lower reservoir of Xilongchi pumped-storage power station;
西龙池抽水蓄能电站下库高边坡控制爆破
2.
Structural Sensitivity Calculation and Analysis of the Melt Hole Position of Steel Penstock of Xilongchi Pumped-storage Power Station;
西龙池抽水蓄能电站压力钢管溶洞部位结构敏感性计算分析
3.
Construction Technology of Excavating Inclined Shaft with High-gradient and Over-length in Xilongchi Pumped-storage Power Station;
西龙池抽水蓄能电站大坡度超长斜井开挖施工技术
6) Xilongchi Pumped Storage Power Station
西龙池抽水蓄能电站
1.
Excavation and support of powder storage project for the Xilongchi Pumped Storage Power Station;
西龙池抽水蓄能电站炸药库工程开挖与支护
2.
Application of demolish blasting technology to crag treatment in Xilongchi Pumped Storage Power Station;
拆除爆破技术在西龙池抽水蓄能电站危岩处理中的应用
3.
Manufacturing and Installation Techniques of Water Diversion Steel Pipe for Xilongchi Pumped Storage Power Station
西龙池抽水蓄能电站引水系统钢管制造安装工艺
补充资料:巴斯康蒂抽水蓄能电站
巴斯康蒂抽水蓄能电站 Bath County Pumped Storage Power Station 位于美国弗吉尼亚州西北部,20世纪80年代是世界上装机容量最大的抽水蓄能电站。装机容量210万千瓦。厂房为半地下式,发电设计水头329米,抽水设计扬程335米,抽水最大流量 116米3/秒。上水库土石坝最大坝高140米 ,坝顶长731米。总库容4400万米3。下水库土石坝最大坝高41米,坝顶长690米,总库容3760万米 3。引水系统包括岸坡式取水口、引水平洞、竖井、压力隧洞、压力钢管和调压井等 。工程于1975年开工,1985年投产。
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条