说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 既有山区铁路
1)  existing mountain railway
既有山区铁路
1.
Based on the specialities of the existing mountain railways,the main factors which influence the speed raising on these railways are analyzed.
根据既有山区铁路的特点,分析了既有山区铁路提速的主要影响因素,考虑到超高参数的选择,满足舒适度的要求,以及满足内外轨均匀磨损等因素,提出了如何确定其提速目标值的方法,并提出了相应的技术对策和工程措施(其中包括圆曲线与夹直线的最小长度、缓和曲线长度等的确定)、行车组织措施及采用摆式车体的设想。
2)  existing railway
既有铁路
1.
The application of jacking construction technique in existing railway construction;
顶进施工技术在既有铁路施工中的应用
2.
Study on application of existing railways in urban transport;
既有铁路参与城市交通运营的研究
3.
Research on erecting beam construction technology of existing railway overhead overpass
既有铁路跨线立交桥架梁施工技术研究
3)  Existing Railways
既有铁路
1.
Test and Research for Speed Raising on Existing Railways in China;
我国既有铁路提速的试验研究
2.
Drawing the experience of Hong Kong\'s urban rail transit development in the context of its New Town development,the author provided analysis and thoughts about the functions of the urban rail transit,the use of existing railways,cost control,and the coordinated urban and rail development.
结合30多年来香港新市镇发展中城乡轨道交通发展的实例,从轨道交通在城乡一体化发展中的功能角色、既有铁路在城乡一体化轨道交通中的利用、如何建设节约型的城乡轨道交通以及城乡轨道交通与沿线协调发展四方面,对城乡一体化中轨道交通的发展提出一些建议和思考。
4)  Existed railway lines
既有铁路线
5)  existing railways
铁路既有线
6)  Existing electrified railway
既有电气化铁路
1.
Taking the Mudaogou Bridge Reconstruction Project as an example,the paper analyzes the crucial and difficult points of techniques in track lining and joining and breaks through the conventional mode of track lining and joining of existing electrified railway lines.
以木道沟桥改建工程最关键技术为实例,探讨了线路拨接施工中线路不同拨距时,接触网施工过渡方法,分析了线路拨接的技术重点和难点,打破既有电气化铁路线路拨接的常规模式,采用“利用既有、永临结合”的过渡施工方法。
补充资料:半山区电梯住宅巡礼

连半山与中环闹市的行人扶手电梯长达八百米,是世界上最长的室外扶手电梯。还可游游由荷李活道出发,上可到些利街、经干德道达半山区;下可沿阁麟街至中央街市。整条电梯将旧式楼宇与新型高级住宅连在一起。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条