说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 人工冻结工程
1)  artificial freezing engineering
人工冻结工程
1.
According to the artificial freezing engineering practice in deep alluvium and simulation tests, it is found that there exists an obvious difference between the mechanics of frozen soil for shallow alluvium and the mechanics of frozen soil for deep alluvium.
人工冻结工程的实践和模拟试验的基础上,提出不同于常规“冻土力学”(暂称“浅土冻土力学”)的“深土冻土力学”概念。
2)  Freezing engineering
冻结工程
1.
The paper introduced the technique and effect of long-term upkeep freezing for some coal mine airshaft,which taken 104 days to be long-term upkeep freezed,it could be used for the analogous shaft freezing engineering-references.
某矿风井井简长期维护冻结工程历时104d,本文介绍了长期维护冻结所采取的措施及收到的效果,可供类似井筒冻结工程参考。
2.
The paper gives some suggestion of optimized energy saving design of freezing work and construction control on energy saving in freezing engineering.
本文从冻结站节能优化设计、施工管理控制等方面探讨冻结工程节能降耗的几点看法与认识。
3)  artificial frozen
人工冻结
1.
Mechanical performance study of three kinds of typical artificial frozen clay shows that of calcic-clay is the worst.
对淮南矿区3种典型人工冻结粘土力学特性的研究表明:钙质粘土力学性能最差;冻结粘土的单轴强度、变形模量和蠕变强度均随温度降低而增加,特别是当冻土温度低于-10℃时,冻结粘土强度随温度降低而剧烈增加,但温度的变化对泊松比影响较小,蠕变状态方程可用形如ε=A(T)σBtC的幂函数表示;在没有补给水源的情况下,其冻胀力可达0。
4)  artificial ground freezing
人工冻结
5)  artificial freezing
人工冻结
1.
Experimental study on rate of frost heave by artificial freezing
人工冻结冻胀速率试验研究(英文)
2.
The temperature field in the course of artificial freezing is not only one of important factors affecting the freezing process and the frost heave and thawing settlement, but also one of major foundations for predicting and numerical simulating the frost heave.
为了研究人工冻结过程中温度场的变化规律,利用自行研制的人工冻结冻胀融沉模型试验装置,对徐州地区常见的粘土进行了12次大规模的冻融试验,分别模拟了封闭系统和开敞系统下人工冻土中温度场的变化情况,并与现场实测数据进行了分析比较,提出了在冻土体和受冻结影响的土体中的温度与距离分别近似成线性,已冻土体中的温度梯度比未受冻结影响土体中的大等几点结论。
6)  artificial freezing method
人工冻结法
1.
Application of artificial freezing method in underground engineering structure;
人工冻结法技术在地下结构工程施工中的应用
2.
The application scheme of the artificial freezing method in Xuanwu Lake subaqueous highway tunnel construction and the constructing procedure of the freezing method are introduced.
介绍了人工冻结法在玄武湖水下交通隧道中的应用方案以及冻结法的施工工艺。
3.
This article systematically introduces the artificial freezing method so as to further spread and apply this technology.
人工冻结法施工技术是软土地区深基坑开挖的一种经济可靠的方法,为了更好地推广应用这一技术,文中介绍了人工冻结法施工技术,并通过对冻结法施工过程中不同时期的热学分析,给出了各个时期的温度场数学模
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)


坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle

一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条