1)  partial dislocation
偏位错
2)  deviation
偏位
1.
Control measures for pile deviation in weak soil ground project;
软弱土地基中工程桩偏位的控制
2.
Combined with a practical instance of construction,the causes of deviation and fracture on PHC pipe pile foundation are analyzed.
结合一工程实例分析了PHC管桩基础在基坑开挖后出现偏位和断裂的原因,提出了在施工和设计等方面的处理措施,介绍了应用锚杆静压钢管桩和钻孔灌注桩对桩基进行补强的措施以及补强处理后的效果。
3.
Based on investigation and analysis,this paper found out the factors affecting deviation of marine piling,i.
通过调查分析,找出影响水上沉桩偏位的因素:地质地貌、水文气象、船机设备、水下障碍物、人员责任心和经验、测绘仪器的误差、过往船只,等等。
3)  displacement
偏位
1.
In reference to one project case history,based on analyzing causation which made pile foundation displacement,this article used static principle and drilling technology itself to pull up or bury the steel structural drum.
该文结合具体的工程案例,在分析造成偏位原因的基础上,采用静力学原理和钻探工艺本身来起拔护筒和埋设护筒,并获得成功,同时还获得了具有工程参考意义的钢护筒与砂卵石之间的摩擦系数值μ=25303。
2.
In view of the features in the process of pre-stressed tubular pile construction, the paper probes into the main causes of tubular pile displacement through analyzing some typical problems arising in the processes of construction and supervision.
本文针对预应力管桩施工中所产生的施工特点 ,结合施工与监理过程中出现的一些较突出的问题进行分析 ,探讨管桩偏位的主要误差来源 ,用误差分析的方法分析总结了管桩的施工与监理时控制限值与控制要点。
3.
On the basis of practice of construction the problem of displacement in caisson foundation of medium and small-sized cloughs is discussed,and the corresponding effective controlling and adjusticy measures are put forward.
在施工实践的基础上,对中小型涵闸沉箱基础施工过程中出现的偏位问题进行研究,提出了有效的控制和调整的方法。
4)  unsymmetrical
偏位
5)  unsym-
偏位
6)  Mandibular deviation
下颌偏位
参考词条
补充资料:位错
      (见晶体缺陷)。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。