1)  construction progress
加快施工进度
1.
In order to ensure the river closure on schedule to avoid the economic loss and unfavorable effects caused by the delay of river closure,the various parties of design,construction and superintendance should take every efforts to quicken the construction progress.
小浪底水利枢纽技术和地质条件异常复杂,要确保工程如期截流,避免推迟截流所带来的经济损失及不良影响,设计、施工和监理等各方面必须想尽一切办法,加快施工进度
2)  Quicken
加快
1.
Thinking of how to quicken training of high profession skillful talents;
加快培养高等职业技能型人才的思考
2.
To quicken the development of China s new and hi-tech industry,the government should enhance its guidance so as to create a better environment for developing the new and hi-tech industry.
加快我国高新技术产业化的发展 ,应加强政府引导 ,为发展高新技术产业创造更好的环境。
3.
So in the discussion on whether to quicken our country s urban construction or not, the authors think that oppidan construction is much fitter for our national conditions.
因此 ,在关于是否加快我国农村城市化建设的讨论中 ,笔者认为城镇化建设可能更符合我国的国情。
3)  speed up
加快
1.
The original railway construction technology standards can not adapt to the demands of railway development,so it is imperative to speed up establishing new construction technology standard systems for railway construction.
原有的铁路建设技术标准已不能适应铁路发展的需要,因此加快构建我国铁路工程建设的新的建设技术标准体系就势在必行。
2.
The original railway construction technology standards can not adapt to the demands of railway development, so it is imperative to speed up establishing new construction technology standard systems for railway construction.
原有的铁路建设技术标准已不能适应铁路发展的需要,因此加快构建我国铁路工程建设的新的建设技术标准体系就势在必行。
4)  Accelerating
加快
1.
In the light of the existing problems,the author suggested a few solutions concerning land management tactics,agriculture industrialization consciousness,processing of farm produce and improvement of the marketing system,product quality control measures,rural information service,government functions in accelerating agricultural industrialization process,etc.
文章分析了庆阳市农业产业化发展的现状,根据存在的突出问题就当地农业产业化发展中的土地经营策略,农业经营意识,农产品加工及商贸市场体系的建立和完善,农产品的质量管理措施,农村信息服务,政府在加快农业产业化进程中的作用等方面进行了有益的探讨和思考,提出了加快庆阳市农业产业化发展进程的措施。
5)  Promote
加快
1.
Only by emancipating our mind, seeking truth from facts, pacing with the times, and opening up and innovating can we promote the development of higher education.
高等教育国际化趋势和人民群众日益增长的教育需求,迫切要求高等教育加快发展。
6)  expediting exploration
加快勘探
参考词条
补充资料:单项工程施工进度计划


单项工程施工进度计划


  定。均衡性是用均衡系数来表示,计算公式如下:工程均衡系数二某分项工程施工期内最高工程量工人人数均衡系数=施工期内最高用工人数l单项工程施工进度计划]确定单项工程中各工序的施工顺序和施工时间的计划,是单位工程施工组织设计的主要组成部分,是具体指导施工的文件。它使单位工程在施工总进度计划和施工企业生产计划的指导下,在规定的期限内,有条不紊地完成拟建工程的施工任务。它的编制的理论依据主要是流水作业原理。其编制步骤一般如下:1.划分工序,确定各工序间的施工先后顺序,并计算工程量,确定各工序的作业时间。2.组成工程组合。由于单位工程所包含的工序数目很多,为了使组织工作简化,一般是把各分项工程(工序)再分组,组成若干分项工程的组合体,即工程组合,把每一工程组合联系起来或组成流水线,然后把它们互相搭接起来而成为整个单位工程的施工进度计划。3.把各工程组合或流水线搭接起来,形成初步的单位工程施工进度计划。组织流水作业的方法,一般是先分别把各工程组合内的分项工程搭起来,组成条条流水线的流水作业,然后再把各条流水线搭起来。各条流水线的搭接方法用累加数列错位减取大差的方法进行。还有一部分不能组织流水或与其他工序无关的工序,根据具体情况搭接安排即可。4.检查、调整、修正初步的单位工程施工进度计划。确定了初步的单位工程施工进度计划以后,就要进行网络时间计算,并检查是否合理。首先要检查工期是否接近最佳工期和符合总进度计划的规定,如果不符则要采取有效办法加以调整。5.计算技术经济指标。单位工程施工进度计划编好后,应评价其经济合理性。一般用均衡系数来衡量,绘制各分项工程施工人数和主要材料消耗量的动态曲线,观察其是否保持均衡。如动态曲线发生高峰低谷频繁波动,则应调整进度,使其趋于均衡稳
  