说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 防洪防凌
1)  flood and ice protection
防洪防凌
1.
Decision making supporting system for flood and ice protection"is a branch research of "The Yellow River administration and water resource use and development", a key proect of the national eighth-five-year plan.
《黄河防洪防凌决策支持系统》是国家“八五”科技攻关项目《黄河治理与水资源开发利用》的一个专题。
2)  ice prevention
防凌
1.
Active functions included increasing water supply, increasing ice prevention guarantee rate and decreasing water interception at Lijin profile; negative included increasing river channel sedimentation and.
其中正面影响包括增加工农业供水量、提高防凌保证率以及减少利津断面断流次数等,负面影响定性分析了补水后下游河道增淤以及对过洪能力的影响。
3)  ice-flood control of Yellow River
黄河防凌
1.
The reservoir regulation is one of the most important ways in the ice-flood control of Yellow River.
水库调度是黄河防凌调度中最为重要的河段防凌手段之一。
4)  operation of ice flood control
防凌运用
5)  Operation for ice prevention
防凌调度
6)  controlling icicle to explode ice
防凌爆冰
补充资料:防凌措施


防凌措施
ice control measures

fangling euoshi防凌措施(iee eontrol measures)防治江河、湖泊、港口以及水工建筑物受冰凌危害所采取的措施。世界各国在高寒地区的河流都有冰凌危害,但冰凌危害有不同的种类,需要采取不同的防治措施:①冰凌冻结江河、湖泊、港口,影响航运交通,可采用破冰船破冰,或在港岸和船闸附近采用空气筛等防冻措施;②冰凌冻结水力发电厂的引水渠,或阻塞拦污栅,影响发电出力,可设法抬高渠道中水位,促使形成冰盖,防止水内冰产生的措施;③冰凌冻结各种泄水建筑物的闸门,影响启闭运用,一般采用加热或其它防冻措施;④冰凌撞击建筑物,如桥墩、闸墩、整治河道的丁坝等,多采用局部加固或破碎大块流冰等措施;⑤冰盖膨胀时,会产生很大的膨胀力,增加建筑物的荷载,应在设计建筑物时考虑,也可在建筑物临水面设置表底水流交换器防冻,或按放圆浮筒减少冰压力的传递等措施。 黄河上、下游,松花江、黑龙江等江河都有冰凌灾害。过去在黄河下游的防凌工作中,曾采取过打冰的措施,但效果甚微。1949年以后,在黄河防凌的实践中,积累了一定的经验,随着对凌汛成因的进一步认识,防凌措施也相应地有所改进。基本上经历了以下两个阶段:①初期认为凌汛是由于冰凌的存在而发生的,冰凌是产生凌汛的主导因素,因而以破冰的方法来防治。采取过的措施有打冰、撒土、破冰船、炸药爆破、炮弹轰冰、飞机投弹炸冰等。并且总结了破冰的经验:即首先注意掌握冰情预报,选择破冰时机,以在快开河时破冰最为有效。早破遇气温下降又复冻结;晚破则失去破冰机会。当河道长,冰量大时,还要选择可能形成冰坝的重要河段,如浅滩、急弯、堤距狭窄等处破冰。②在实践中,认识到,河内的冰凌,如果没有水流作动力,冰凌静止不动,不能形成冰凌危害。所以水流应该是形成冰凌危害的关键。如果控制水量,不使凌峰形成,可以避免冰坝的产生。即使发生堵塞,由于来水量有所控制,可限制洪水位的升高,防止危害。故在1960年三门峡水库和1968年刘家峡水库建成运用后,黄河上、下游的防凌措施,便由破冰为主发展到以调节水量为主、破冰为辅的阶段。调节凌汛期河道水量的主要措施有:水库调节,利用两岸涵闸分水,分洪区滞蓄,展宽堤距等项措施。随着江河的梯级开发,有足够大的水库库容,逐段拦蓄冰水,调节河道水流、温度,可以从根本上解决冰凌危害。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条