1) sluice operation
闸门操作
1.
Selection of a final design is an iterative processinvolving many factors,including the general layout of the project,sluice operation andeffect of tailwater detention.
介绍挖深式消力池程序设计方案,考虑闸门操作方式、下游水深滞后等因素影响,并对收缩水深及其跃后水深、经验数表等问题进行了讨论。
2) switching operation
倒闸操作
1.
Application of rule-based system Jess in electrical switching operation simulation;
基于规则系统Jess的电力倒闸操作仿真系统应用研究
2.
Analyses on synthetic factors influencing electric switching operation in substation;
影响变电站电气倒闸操作的综合因素分析
3.
Exploration and implementation of switching operation licensing mechanisms for power transformation equipment
变电运行设备倒闸操作许可制的探索与实践
5) handling airlock
操作气闸
6) brake-operating rod(lever)
闸操作杆
补充资料:平板闸门(见平面闸门)
平板闸门(见平面闸门)
Pingban zhamen!门。平板闸门见平面两
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条