说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 基础开挖设计
1)  design of foundation excavation
基础开挖设计
2)  foundation excavation
基础开挖
1.
Based on actual project,the author discussed influences of new constructed foundation excavation to neighbor buildings to propose corresponding countermeasures by analyzing foundation stress in different stages.
高层建筑基础一般埋置较深,基础开挖后对邻近的高层建筑地基会有一定的影响。
3)  excavation foundation
开挖基础
4)  large excavated foundation
大开挖基础
1.
According to the research and analysis of dredged foundation principles,and comparison between traditional and modern large excavated foundation,advantages of dredged foundation are proposed in the light of actual engineering case.
通过对掏挖基础的原理分析和研究,并与传统的大开挖基础形式作比较,以工程实例来说明掏挖基础的优点。
5)  excavation design
开挖设计
6)  all course design during excavation
基坑开挖全过程设计
补充资料:电炉基础设计


电炉基础设计
design of electric arc furnace foundation

  d ian{u Jiehu sheji 电炉墓础设计(design of electriC ar。furnaee foundation)支承并固定炼钢电弧炉及其相关 设备的基础结构设计。通过基础将各种荷载及动力作 用传给地基。设计电炉基础,特别是当采用地坑式结构 时,要做好结构的防水措施,以避免生产中漏钢时发生 爆炸事故。此外,为防止生产中的高温辐射作用及溅渣 现象,要采取隔热与防护措施。设计主要内容包括原始 资料收集、基础形式、基础计算、基础构造和隔热保护 措施。 原始资料收集见冶全厂矿设备基拙设计。 基础形式分为地坑式(图1)及高架式(图2)两 种。小型电炉可采用地坑式或高架式基础,大、中型电 炉多采用高架式基础,一般为支墩式并与厂房基础分 开。在中国,20世纪70、80年代以来所建成的多座 sot、75t、got以及90年代初期建成的zsot电炉均采 用高架式基础。 1~2 乙、一2一/~ 1 11翻尸\1匕二〕口,,门}.1 21瞪.亡二:二二口万商而自112 了口一4bt护罗t豢溢扩 卜12-2 图1地坑式电炉荃础图 a一操作平车轨道在坑壁顶面石一操作平车轨道在坑内 1一出钢坑;2一出渣坑;3一轨道中心线;4一电炉底座的墓础 地坑式基础的操作平车轨道有布置在坑壁顶面和 坑内两种形式。为了减少出渣坑壁因烘烤而破坏,要优 先将平车轨道布置在坑壁顶面(图la)。对于高架式基 础,一般采用在整体底板上设两片墙式结构以支承炉 体,在一个墙体的外侧固定电炉提升机构,在两墙体中间的地面标高处,铺设轨道,并在电炉基础范围外侧的一端布置出渣轨道基础,另一端布置出钢轨道基础。麟豺 l一1 ,8 止1 ..,一丫川l川、-六一习【上立一~J一通-一二 ,一 图2高架式电炉基础图 1一电炉中心线;2一电炉提升机构中心线门一电炉轨道中 心线;4一隔热保护层;5一碎石层;6一荃础本体(钢筋 混凝土);7一墓础垫层;8一出钢轨道墓础;9一出渣轨道墓础 计算要点须考虑炉体设备重、最大装料重、附属设备重及生产过程中产生的其他外力。对于地坑壁要考虑土压力及地面荷载的作用。遇到地下水时,尚须计入水压力,按有关规范规定,计算确定结构构件截面尺寸和配筋量。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条