说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 超接近施工
1)  Super-near Construction
超接近施工
2)  close-space construction
近接施工
3)  adjacent construction
近接施工
1.
While most of researches on adjacent construction are based on experience and case study with little system study,it seems from actual design norms of China that such reaches are mainly based on no-sphere of influence of elastic solution and empirical value,or separate model,which lack of require and sufficiency analysis by theory.
随着地下空间的综合开发利用,大量的隧道及地下工程的近接施工问题涌现出来。
4)  adjacent construction
接近施工
1.
In recent yeas, city s development usually barges up against adjacent constructions.
接近施工是近年来城市建设中经常遇到的问题 ,南京地铁鼓楼站距南北向道路隧道的水平净间距为 14m ,鼓楼站为三层岛式车站 ,南北向道路隧道为双连拱结构 ,复合式衬砌。
5)  Approaching construction
近接施工
1.
The Mechanics Behavior Analysis in Approaching Construction of Two Parallel Shield Tunnels;
两孔平行盾构隧道近接施工的力学行为分析
2.
Study on Approaching Construction of Two-Tube Shield Tunnels by Centrifuge Model Test;
双孔盾构隧道近接施工离心模型试验研究
3.
In recent years, with the development of underground engineering such as subway, many approaching construction of underground engineering has appeared.
近年来,随着城市地下铁道等地下工程建设的发展,出现了大量地下工程近接施工问题。
6)  approaching excavation
近接施工
1.
With the rising of "subway-hot" in big cities,the approaching excavation of the tunnel has become an important and urgent issue needed to resolve.
随着全国各大城市地铁热的兴起,隧道的近接施工已成为一项重要且亟待解决的课题。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条