说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 凋落物周转时间
1)  litter turnover time
凋落物周转时间
1.
sclerophylla mixed forest communities,and pure Pinus massoniana changes between 3 9880kg/hm2 and 9 2698kg/hm2,whereas annual litter range is 2 8530~7 0780kg/hm2Based on the Comparative analyses of withered and fallen amount accumulations,as well as with ered and fallen rates,the litter turnover time of the aboved 7 communities is 115 years,0.
基于对凋落量积累和分解速率的比较分析,可预测上述7个群落的凋落物周转时间依次为1 15、0 76、1 42、0 97、1 17、0 84及1 52a。
2)  turnover time
周转时间
1.
The seasonal variation and affecting factors of phosphorus uptake amount and turnover time of heterotrophic bacterioplankton in Jiaozhou Bay were studied in June, August, 2003 and March, 2004.
为了解异养浮游细菌在磷的海洋生物地球化学循环和海湾富营养化中的作用,于2003年6月、8月和2004年3月采用现场调查和实验室培养相结合的方法,对胶州湾异养浮游细菌的无机磷酸盐吸收量、周转时间及影响因素进行了研究,结果表明,胶州湾异养浮游细菌对无机磷酸盐的吸收量在春、夏、冬季分别为4。
2.
A model is established aiming at both maximum utilization of vehicle loading capacity and shortest turnover time.
以车辆的载重量利用最高,且车辆周转时间最短为目标建立模型,并把原问题分解为两段用遗传算法求解:先求出第一个目标的优化结果,在此结果上再按第二个目标优化,得到问题的满意解。
3.
This paper discussed the turnover course of railway freight car and the ship time of cargo in detail, analyzed the various factors that influece the turnover time and calculated the increment of the time.
对铁路货车周转时间及货物运送时间进行了较详细的探讨,对造成周转时间与货物运送时间延长的各时间因素及其影响程度进行了分析计算,并提出了相应的建议。
3)  litter [英]['lɪtə(r)]  [美]['lɪtɚ]
凋落物
1.
Estimating standing stock of litter in the Larix olgensis plantation by geostatistics method;
用地统计学方法估算长白落叶松人工林凋落物现存量
2.
Influence of litter importation on basal respiration and labile carbon in restored farmland in Sanjiang Plain;
凋落物输入对三江平原弃耕农田土壤基础呼吸和活性碳组分的影响
3.
Effect of enclosure on litter decomposition and TN element release of grassland in Malong County of Yunnan province;
云南马龙县山地封育草地凋落物分解与氮释放的研究
4)  litter fall
凋落物
1.
Annual variation of Longan litter fall and the annual flows on eroded slope orchard of Fujian;
福建侵蚀坡地果园龙眼凋落物的年变化及库流量
2.
Production and seasonal change pattern of litter fall of Rhiz ophora apiculata in Sanya River mangroves,Hainan Island;
海南三亚河红树凋落物产量与季节变化研究
3.
A distinct seasonal pattern was found with peak litter fall occurring in summer rainy season, particularly, in August.
利用凋落物收集网研究城镇生活污水排放对红树林植物群落凋落物的影响 。
5)  litterfall
凋落物
1.
Nutrient flux and its dynamic change of litterfall in a Chinese fir plantation forest;
杉木人工林凋落物养分通量及其动态
2.
The eluviations and acid buffering effect of litterfall in Shaoshan conifer and broad-leaved mixed forest;
韶山针阔叶混交林凋落物层的淋溶及缓冲作用
3.
Impacts of nitrogen deposition on microelement concentrations in the litterfall of Chinese fir plantation;
氮沉降对杉木人工林凋落物微量元素含量的影响
6)  litter fall
凋落物量
1.
Study on the dynamic variation of litter falls in Maolan Karst forest
茂兰喀斯特森林凋落物量的动态研究
2.
Result showed that the annual litter fall production was estimated to be 2 427.
对杉木人工林凋落物量进行了为期1 a的监测,研究结果表明:杉木人工林年凋落物总量为2 427。
补充资料:周转时间


周转时间
cycle time

zhouzhuan shi」jan周转时间(c ycle time)指焦炉操作中,同一炭化室(炉孔)两次推焦(或装煤)的时间间隔。也是由一套焦沪机械操作的全部炉孔的总操作时间加检修时间之和。它是衡量焦炉生产能力的重要指标。操作时间的长短取决于操作一个炉孔所需的时间和所操作的炉孔总数。根据周转时间.可制订焦炉循环检修计划。结焦时间较短或煤料挥发分较高时,炭化室内容易产生沉积炭,而有可能引起焦饼难推。因此,需定期烧空炉,即炭化室在推焦后暂不装煤,利用由止升管产生的热浮力,从远离上升管一侧的装煤孔吸入空气来烧掉沉积炭。烧空炉的时间为操作时间的倍数,烧单空炉指第二个炉孔推焦后,再给第一个炉孔装煤,若原操作时间为10分钟,则烧单空炉后的操作时间为20分钟;烧双空炉则是指第三个炉孔推焦时,再装第一个炉孔.此时的操作时间为30分钟。烧空炉增加的操作时间以缩短结焦时间来补偿,以保证周转时间不变。焦炉操作率是焦炉24/二、时内出焦的炉孔数与焦炉总炉孔数之比,也是一孔炭化室一昼夜出炉的次数。 庄二、**每日推焦炉孔数、,。。。/ 焦炉操作率~先轰携兴若甘命并xl。。.% 局”~’r”一焦炉总炉孔数‘、‘”‘’zJ 它可作为焦炉生产状况的考核指标周转时间和焦炉操作率有如下的关系: 周转时间二24h/焦炉操作率对已经生产的焦沪而言,炭化室宽度已经固定,可用焦炉操作率判断焦炉每年的生产情况。 (葛茂弟李哲浩)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条