说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 蚕茧生产
1)  Cocoonproduction
蚕茧生产
2)  Silkworm cocoon output
蚕茧产量
3)  Cocoon quantity and quality
蚕茧产质量
4)  Antheraea cocoon
柞蚕生物茧
1.
Under the controlled climate, in Yingkou city, Xifeng country (both in Liaoning province), Kouqian township and Dunhua city(both in Jilin province), belly-cutting eggs of Antheraea cocoon were hosted by Trichogrmma, then storied at low temperature for 15,30,45and 60 days respectively.
试验研究了不同寄主产地柞蚕生物茧的剖腹卵被赤眼蜂寄生后,在人工气候条件下冷藏15、30、45、60d的赤眼蜂的羽化率。
2.
Relations between Antheraea cocoon Quality and Its Oval as Trichogramma Host;
研究认为:应建立以卵量母种投产柞蚕生物茧的四级繁育体系,生防用茧必须从柞蚕生物茧以上种级中选出,其内染率应控制在15 % 以下;早春暖茧,其蛹滞育前期可适当补温,发蛾暖茧温度以中温偏低(18 ℃~22 ℃) 为宜;夏季暖茧,其蛹滞育前期不宜多补温,发蛾暖茧温度以中温偏高(20 ℃~24 ℃) 、 R H75 % ~85 % 为宜。
5)  Cocoon and raw silk
蚕茧和生丝
6)  Silk cocoon
蚕茧
1.
Effect of nitrogen and potassium combined application on mulberry (Morus atropurpurea Roxb.) leaf yield and quality,and silk cocoon quality;
氮钾肥配合施用对桑叶产量品质及蚕茧质量的影响
补充资料:JIT准时制生产(及时制生产)

JIT准时制生产(及时制生产):是应用拉引式生产物流控制原理的方法。在生产系统中任何两个相邻工序即上下工序之间都是供需关系,如何处理这种关系,就是生产物流所要研究的问题。按照传统的生产计划组织生产(包括MRP),物料根据预定的计划时间由供方向需方逐个工序流动。需求方根据上一工序送来物料的数量和到达时间进一步加工。需求方接受物料完全是被动的,如果出现不可预料的因素,物料可能提前或延迟到达。延迟到达将使生产中断,必须在生产计划中留有余地,以避免这种现象的发生。这样一来,必然存在或多或少、提前到达的现象,从而导致系统中库存量的上升,产生种种库存多余的弊病。JIT的方法改变了传统的思路,由需方起主导作用,需方决定供应物料的品种、数量、到达时间和地点。供方只能按需方的指令(一般用看板)供应物料。送到的物料必须保证质量,无残次品。这种思想就是以需定供,可以大大提高工作效率与经济效益。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条