说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> SMW公式
1)  Sherman-Morrison-Woodbury formula
SMW公式
2)  SMW pile
SMW桩
1.
For the sake of safety and economy,the distance between SMW piles is optimized and reasonable design proposal is obtained.
提出了门架式围护结构计算模型,模型中将桩受到的地基土抗力简化为弹性支撑;并对双排SMW桩门架式围护的桩间距进行了优化分析,兼顾安全经济原则,得出较为合理的设计方案。
3)  SMW model
SMW模型
1.
Successive researchers have built many chemical equilibrium models such as HM model, HMW model and SMW model.
后继研究者以Pitzer理论为基础 ,建立了较有代表性的HW模型、HMW模型以及SMW模型。
4)  SMW construction method
SMW工法
1.
The application of SMW construction method in deep foundation for a certain drinking-water directly project from Hangzhou;
SMW工法在杭州某直饮水工程深基坑中的应用
2.
Application of SMW construction method to foundation reinforcement during cutter-changing of shield machine under normal pressure in construction of Yellow River Crossing of South-to-North Water Transfer Project
SMW工法在南水北调中线穿黄工程盾构机常压换刀时地基加固中的应用
3.
The SMW construction method application in foundation ditch maintenance engineering of Qinfen road in Wenzhou
SMW工法在温州勤奋路基坑围护工程中的应用
5)  SMW method
SMW工法
1.
On the construction technique of SMW method;
浅析SMW工法的施工技术
2.
The application of SMW method in foundation pit support under complicated environment;
SMW工法在复杂环境基坑支护中的应用
3.
Using the SMW Method in a Pipe Project;
SMW工法在顶管工程中的应用
6)  SMW technology
SMW工法
1.
The study of characters of cemented soil in medium-hard soil by triaxial compression test of SMW for a foundation pit in Beijing subway have done,the results compare with SMW technology in soft-strata shown as follow:the cohesion in cemented soil was strengthened;the variation of internal friction angle in cemented soil is complex;the shea.
针对SMW工法缺乏对中硬地层的水泥土性能研究,利用首例北京地区在中硬地层中地铁基坑工程采用SMW工法搅拌后的水泥土,进行了三轴压缩试验。
2.
Through optimizing design, the supporting structure in the foundation pit uses the SMW technology of continuous wall plus inner-supporting system.
通过优化设计,基坑支护结构采取SMW工法连续墙加内支撑的支护体系,地下水控制采用SMW工法形成侧向止水帷幕和中深井降水相结合的处理措施,并运用了信息化施工管理技术。
3.
<abstract>is paper introduce the application of SMW technology to structure the protection of foundation excavation at south prolongation in the first line of Nanjing Metro.
通过介绍南京地铁一号线新街口站南延段基坑围护结构SMW工法的应用实例,并从应用效果与其它工法对比等方面加以分析,探讨SMW工法在地铁基坑围护中的应用前景。
补充资料:70/30费率公式


70/30费率公式


  【70150费率公式】承保旧飞机或按原价贬值的飞机时,通常采取的调整收费的方式之一。根据历来的赔付记录,在机身全额赔款中,全吝啦失赔款为70%,部分损失赔款占30%,故以70%计算全损部分费率,以30%计算部分损失费率。通过这一方式,可调整部分损失情况下,新旧飞机价格差额部分应交的保险费。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条