您的位置:首页 -> 词典 -> 进度风险管理
1)  scheduling risk management
进度风险管理
1.
The scheduling risk management based on task critical chain was discussed in this paper.
文中讨论基于关键链技术的软件项目进度风险管理方法。
2)  progress risk
进度风险
1.
A model for progress risk analysis based on multiple risk probability was constructed according to the risk distribution characteristics of naval gun system development.
针对舰炮武器系统研制工程进度的风险分布特征,建立了基于多元风险概率的进度风险分析模型,给出了基于正态分布和指数分布的进度风险估算方法,并结合具体风险因素分析了舰炮武器系统研制进度风险评估的指标和准则,最后给出某型大口径舰炮研制的风险分析实例,验证了文中方法的有效性和可靠性。
2.
The progress risk research in identifying and estimating of major model projects is described first, then a method of progress risk analysis based on Monte Carlo simulation is provided and a case study is presented in detail to illustrate the total process of the method.
对重大型号工程进度风险的识别和估计方法进行了讨论,研究了总工期风险的蒙特卡罗仿真方法,并结合实例对某型号项目研制进度风险进行了定量分析。
3.
tactical and technical targets,progress and cost) in the aerospace projects,this paper puts forwards a random network model of aerospace project development process by using the theory and method of random network,analyses the expensie risk and the progress risk of the project.
鉴于各种不确定性因素对航天三项关键参量(战术技术指标,进度和费用)影响的重要性,应用随机网络理论和方法,建立了航天项目研制过程的随机网络模型,对航天项目进度风险和费用风险进行了定量化分析和研究。
3)  schedule risk
进度风险
1.
Study of Chemical Product Manufacturing Relocation Project Schedule Risks;
产地转移化工项目进度风险研究
2.
This paper established is a risk analysis models of normal distribution, β distribution and triangular distribution of Graphical Evaluation and Review technique, for the study of the character of developmental program of weapon equipment schedule risk distribution.
为研究装备研制工程进度的风险分布特征,建立了包含正态分布、β分布、三角分布的随机网络 进度风险分析模型,通过蒙特卡罗法仿真获得工程项目的进度估计及其统计分布特性,从而获得工程总工期的 风险,并结合实例进行了分析。
3.
Then,the definition of construction schedule risk is given and the MC simulation method for the schedule risk is proposed.
分析水利水电工程施工进度计划对工程建设动态投资的影响 ,给出施工进度计划风险的定义 ,提出施工进度风险计算的MC仿真方法 。
4)  Risk Management System
风险管理制度
1.
This article analyzes the problems existing in the quality and safety management of construction projects in China,provides the idea of how to establish the Risk Management System and gives an example of the practical attempt of this system in Shanghai.
探讨我国建筑工程质量安全风险管理中存在的问题,提出建立风险管理制度的思路,并介绍了上海市的制度试点。
2.
Based on an analysis of the present organizational structure and management mode,the examination mode,the credit-granting risk management mode,and the supervising & balancing mechanism in China s commercial banks,this paper holds that the present risk management system in China is incentive-incompatible and that reform should be made.
通过对我国商业银行现行组织结构、管理方式、考核方式、授信风险管理方式、监督制衡机制的分析,提出我国现有的风险管理制度是激励不相容的,必须进行改革,并提出改进建议。
3.
Expo Village blocks E and F are the pilot project of Shanghai construction engineering risk management system.
上海世博村E、F地块建设项目是上海市建设工程风险管理制度的试点项目,通过研究该风险管理制度试点的具体内涵、参与主体、工程保险和工程风险控制的实施情况,分析本次试点存在未能引进专业风险评估机构和安全质量事故鉴定中介机构,以及没有完全理顺风险管理公司与保险公司关系等问题,提出在我国进一步推广工程风险管理制度必须结合我国国情有选择地推行强制性工程保险,注重对工程风险管理需求主体、工程风险管理中介机构和工程保险专业人才的培育。
5)  multi-dimensional risk management
多维度风险管理
6)  Risk Measurement and Management
风险度量与管理
补充资料:风险与风险管理概述


风险与风险管理概述


  【风险与风险管理概述】人类从事任何经济社会活动都有风险,项目融资也不例外。为了帮助读者理解项目融资活动中各参与方涉及的种种风险及其管理,先介绍一般风险及其管理的基本内容。 1.风险的基本概念 (l)风险的定义 人们对风险有各种理解。有人认为,风险是人类活动结果的不确定性。人们从事活动,其后果有可能是他们希望得到的,也有可能是不希望得到的。也有人认为,风险就是不利的后果。还有人认为,风险是由于未来行动决策及客观条件的不确定性而引起的后果与预定目标之间发生多种偏离情况的综合。 本章采纳第一种人的看法。按照此种人的看法,风险是可以度量的,其大小是活动的各种后果出现的概率与后果本身大小的乘积之和。活动的后果可以叫做风险事件。 (2)风险的特征 风险的特征是人类活动内在规律的外在表现。正确认识风险的特征,对于识别和量化风险、加强风险管理、减少损失、圆满地实现项目目标具有重要意义。 ①客观性。不确定性是客观事物和人类活动发展变化过程所固有的,因此风险无处不在、无时不有。 ②潜在性。风险往往不显露在表面。正是卷八衍生品交易5 15由于这种潜在性,人们才不容易注意到它们的存在,才容易在各种活动中蒙受损失。但是,是否真的蒙受损失却是有条件的,只有促使风险事件发生的条件或者环境变成现实时,风险才从潜在状态转化为现实,成为风险事件, ③可测性。人们可以通过观察和监视,进而做出合理的判断,对可能发生的潜在风险进行预测、估量和评价,就有可能较为准确地把握风险。在此基础上,制定出相应的防范、管理和控制措施。 ④相对性人们面临的风险是与其从事的活动、在活动中的行为方式和决策密切相关的一同一风险事件对不同的活动主体会带来不同的后果;同一活动主体,如果行为方式、决策或措施不同,也会面临不同的风险后果;不同的活动主体对待同一风险的态度可能是不同的;因此,风险是相对的。 ③随机性。即使客观条件相同,风险事件有可能发生,也有一可能不发生。风险事件带来的后果也是多种多样。每种后果出现的可能性大小(概率)都有其客观规律。这种规律称为概率分布。掌握了这种概率分布,就有可能对风险后果作出数量上的估计_〕 (3)风险的效应 风险的效应是风险对活动主体以及内外环境的有形和无形的影响。由风险的性质和特征以及活动主体的观念和动机所决定。 ①诱惑效应。