说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 可比综合成本
1)  Com-parable synthesis cost
可比综合成本
2)  integrated comparison
综合可比
3)  comparable cost
可比成本
1.
The linear programming model was established by the manner of converting sintering costs of various sinters to a certain sinter′s comparable cost.
将不同品位的烧结矿成本按某一品位折算为可比成本,建立了线性规划模型。
4)  "a synthetic comparison and analysis of new cost"
新成本综合比较分析
1.
The evaluation system for "a synthetic comparison and analysis of new cost" of international competition capability comprises five steps such as evaluation of factor index, evaluation of single norm competition capability, evaluation of three costs, evaluation of property competition capability and transformational competition capability, and evaluation of international competition capability.
国际竞争力“新成本综合比较分析”评价体系由五个层次的评价内容构成 ,即 :因素指标表现评价、单项竞争力评价、三大成本评价、资产竞争力和转化能力竞争力评价、国际竞争力评价。
5)  comprehensive cost
综合成本
1.
A comparison study was carried on from the views of life,time efficiency and comprehensive cost etc.
通过介绍进口钻机性能和进口金刚石钻头、国产金刚石钻头的使用情况,进行对比选择,比较其寿命、时效和综合成本等,优选国产钻头来代替进口钻头,并取得比较好的效果。
2.
According to the computation and analysis of comprehensive cost for cement concrete and asphalt concrete pavements,including the construction,maintenance and lifetime,this article describes that technical policies which should be taken in the construction of rural highway to build the cement concrete pavement,and concrete pavement is that of comprehensive cost.
通过对水泥混凝土路面和沥青路面建设成本、养护成本和使用寿命的综合成本计算与分析,论述了修筑水泥混凝土路面是农村公路建设中应该采取的技术政策,是使用期间综合成本最低的路面。
3.
Corresponding contributions of the three control measures to comprehensive profit(CP)and comprehensive cost(CC)were calculated and ranked,which were regarded as the assessment criteria of the control measures.
对3种防治措施的综合效益和综合成本进行计算和排序,作为选择豚草防治措施的准则。
6)  embedded cost method
综合成本法
1.
the accounting based embedded cost method and the economics based marginal cost method.
目前所提出的输电定价方法主要分为基于会计学的综合成本法和基于微观经济学的边际成本法。
补充资料:可比产品成本分析(generalproductcostanalysis)
  全部商品产品成本分析的一个重要组成部分,主要是对可比产品成本的计划降低额和计划降低率的执行情况进行分析。在进行分析时,首先要计算出实际完成的降低额和降低率,然后与计划的降低额和降低率进行比较,以便了解可比产品计划的降低额和降低率进行比较,以便了解可比产品计划降低任务的完成情况。计划降低额和计划降低率、实际降低额和降低率的计算公式如下:

  在进行以上分析基础上,还要进行原因分析。由于影响可比产品成本计划降低额完成情况的因素有产量、品种结构以及单位成本变动三个方面。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条