说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 抗震设防要求
1)  Earthquake resistant and fortify require
抗震设防要求
2)  The 3-level defence requirements for seismic design
抗震设计三个水准设防要求
3)  seismic requirement
抗震要求
4)  basic requirements for seismic design
抗震设计基本要求
1.
Lessons learnt from building damages in the Wenchuan earthquake——three earthquake performance objectives and basic requirements for seismic design of buildings;
汶川地震建筑震害启示——三水准设防和抗震设计基本要求
5)  fortify demand
设防要求
6)  Seismic design
抗震设防
1.
Based on the relaction between shearf wave velocity of soils and seismic design ,the author of this paper proposed the important to test the wave velocity of soils.
本文通过简述土层等效剪切波速与抗震设防的关系,说明进行剪切波速测试的重要性。
2.
The measures to solve the problems in the rural house construction and to improve the seismic design for them are proposed.
结合西部村镇房屋修建过程中出现的诸多问题 ,提出了加强房屋抗震设防的措
3.
There is still no specific seismic design code for offshore platforms in China.
在此基础上,根据我国海域地震活动特征、海洋平台的设计基准期和设防目标等因素,参照相关行业工程抗震设防标准的经验,提出我国海洋平台用于强度设计的正常使用极限地震重现期取200年、用于延性设计的变形极限地震重现期取1000年。
补充资料:发包人要求承包人按时开工和按要求施工的权利
发包人要求承包人按时开工和按要求施工的权利:承包人应当按照合同的约定做好开工前的准备工作,负责作好施工场地的平整,施工界区内用水、用电、道路、以及临时设施的施工:编制施工组织设计或施工方案;按照约定作好材料和设备的采购、供应和管理;向发包人提供应由发包人供应的材料、设备的计划,承包人应按照合同约定的开工日期按时开工。在施工中,承包人须严格按照施工图及说明书进行施工,承包人不按照施工图和说明书施工而造成工程质量不符合合同约定条件的,应当负责无偿修理或者返工。《民法》第一版 第515页 魏振瀛 北京大学出版社
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条