1) correlation and stacking
![点击朗读](/dictall/images/read.gif)
相关迭加
2) Iterative correlation
![点击朗读](/dictall/images/read.gif)
迭代相关
3) phase summation
![点击朗读](/dictall/images/read.gif)
相位迭加
1.
We briefly introduce the phase summation method,which is used to analyze the diffraction property of reflective volume holographic gratings,together with angular and wavelength selectivity.
本文简要介绍了相位迭加方法,并用该方法分析了反射式体全息光栅的衍射特性,角度选择性和波长选择性,对分析得出的结果进行了数值模拟,并将此方法与经典的耦合波理论进行了对比分析。
4) iterative addition
![点击朗读](/dictall/images/read.gif)
迭代相加
5) autocorrelation iterative
![点击朗读](/dictall/images/read.gif)
自相关迭代
6) coherent superposition state
![点击朗读](/dictall/images/read.gif)
相干迭加态
1.
If the light field seen by the atom is a “π/2 pulse” light, the atom will be in a coherent superposition state after interaction, the one state is the same as the initial state of the atom, and another state is a new state in which the degrees of at.
如果作用光相对于原子而言为一个“π/2脉冲”光时,那么经过作用后,原子将处于一个相干迭加态,其中一个态与初始态相同;另一个态为新态,并且原子动量增量为两倍单光子反冲动量。
补充资料:相关成本与非相关成本(relevantcostandirrelevantcost)
成本按其发生是否与决策项目相关的分类。相关成本是指与制定决策方案有关的联影响的成本,例如当期是否接受一批订货,生产该批订货需要花费的各种成本,即为相关成本。如该批订货是一种特殊订货,即其价格低于以前生产这种产品的完全成本时,其相关成本就是生产该批产品的变动成本。如果生产该批订货需扩大生产能力时,相关成本就既包括生产的变动成本,还包括添置设备等所需的其他成本。机会成本、差量成本、现金支出成本、可避免成本等均属相关成本。
非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条