说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 测绘生产单位
1)  S/M production unit
测绘生产单位
1.
The fundamental tasks of S/M production units, the basic law of the from of S/M technical personnel, and the role and position of the college graduates and secondary specialized school graduates are introduced.
介绍测绘生产单位的基本任务,测绘技术队伍形成的基本规律,专科与中专毕业生在测绘生产单位的作用与地位,以及建设一支又红又专测绘队伍应采用的措施。
2)  S/M unit
测绘单位
1.
Implementing ISO9000 is the need to deepen and develop the standardizational management in S/M units, and establish and improve the quality assurance system.
通过贯标取得认证,可以提高测绘单位的知名度,取得用户的信任,在市场竞争中立于不败之地。
3)  surveying and mapping production
测绘生产
1.
In this paper, the difference between the expenses in surveying and mapping production made by state bureau of surveying and mapping and provincial financial budget made by Hubei province finance bureau is introduced.
介绍了国家测绘局编制的《测绘生产成本费用定额》与湖北省财政厅编制的“财政预算科目”之间的差异。
4)  Surveying and mapping unit of geological reconnaissance
地勘测绘单位
5)  department of surveying and mapping of water conservancy
水利测绘单位
1.
The work of station-disposing management in department of surveying and mapping of water conservancy is a big reformation and innovation.
水利测绘单位开展岗位设置管理工作,建立岗位设置管理制度,是水利测绘单位人事管理制度的重大改革和创新,2008年初,岗位设置管理在全国水利测绘行业全面铺开,进入实施阶段。
6)  S/M institution
测绘事业单位
1.
This paper analyses the issues in fixed assets management of S/M institutions and provides suggestions for enhancing the management for it.
对测绘事业单位固定资产管理存在的问题进行了分析,并提出了加强管理的若干建议。
补充资料:JIT准时制生产(及时制生产)

JIT准时制生产(及时制生产):是应用拉引式生产物流控制原理的方法。在生产系统中任何两个相邻工序即上下工序之间都是供需关系,如何处理这种关系,就是生产物流所要研究的问题。按照传统的生产计划组织生产(包括MRP),物料根据预定的计划时间由供方向需方逐个工序流动。需求方根据上一工序送来物料的数量和到达时间进一步加工。需求方接受物料完全是被动的,如果出现不可预料的因素,物料可能提前或延迟到达。延迟到达将使生产中断,必须在生产计划中留有余地,以避免这种现象的发生。这样一来,必然存在或多或少、提前到达的现象,从而导致系统中库存量的上升,产生种种库存多余的弊病。JIT的方法改变了传统的思路,由需方起主导作用,需方决定供应物料的品种、数量、到达时间和地点。供方只能按需方的指令(一般用看板)供应物料。送到的物料必须保证质量,无残次品。这种思想就是以需定供,可以大大提高工作效率与经济效益。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条