1)  bid price
标底估算
2)  pre-tender
标底
1.
How to make pre-tender price in the building project item;
浅析如何编制建设工程项目招标标底价格
2.
The action of pre-tender estimate in bidding;
论标底在招投标中的作用
3.
From application scope,government management pattern,cost estimate,pre-tender estimation,principle of winning the bidding and other aspects the differences between domestic and international engineering in bid invitation and submission are analyzed.
从适用范围、政府的管理模式、确定造价的依据、标底的编制、中标原则等方面分析了国内国际工程招投标的差异,阐述了我国招标投标制度需要改进的方向,以规范和完善我国工程招投标的发展。
3)  bidding price
标底
1.
Study on the rationality of the bidding price under the valuation pattern of engineering amount list;
工程量清单计价模式下标底合理性探讨
2.
The paper introduces some keypoints in controlling construction cost at the stage of quantity list evaluation,it must attach importance to compiling quantity list,checking the bidding price;winning bid in reasonable low price with careful bidding price evaluation and consultation;The reasonable contract should be confirmed.
工程量清单计价在招投标阶段工程造价控制工作重点为:注重工程量清单编制工作;注重标底的编制审核;重视评标、询标工作,合理低价中标;慎重确定合理的合同。
4)  Bid price
标底
1.
Principle and Method of Preparing Bid price of Highway Project;
公路工程标底的编制原则与方法
5)  pre tender
标底
1.
Combined with several years practical experiences in pre tender audit the issues existed in pre tender estimation are analyzed; at the same time from several aspects corresponding specifications are proposed to estimate the lower limit on bid with high quality.
结合近年来对标底审查工作的实践 ,分析探讨了标底编制中存在的问题 ,从严格遵循标底编制的原则 ,标底的保密与审定等方面 ,提出了标底编制的几点要求 ,以保证标底的高质量、高水
2.
Combined with practical tendering work the conception of pre tender price in building project tendering is briefly elaborated as well as its function, estimation principle and foundation.
结合招投标工作的实践 ,简要阐述了建设工程项目施工招标标底价格的概念、作用 ,编制原则及依据 ,提出了标底价格的编制方法、类型及合成、审定与保密原
6)  lower limit on bids
标底
参考词条
补充资料:标底


标底
bid

b 100d{标底(b id)工程“标的”的价格,是项目建设法人对划人标内的全部项目实施招标的期望价。水电站建设根据工程特点划分“标的”,一个标的只能有一个标底。在欧美国家是市场行情预测价,在中国.标底是用定额等计价标准编制的标准价格。标底应符合价值规律,有利于竟争和保证工程质量。一般控制在批准的概算限额内。在评标过程中标底是衡量投标报价是否合理的基准。标底必须保密。 标底由项目建设法人自行编制或委托具有资质的咨询单位编制。编制依据为:招标文件(包括标底内容.商务条款,技术条款,施工图纸,工程量清单等)、施工条件、当前施工技术和价格水平、法定的或合理的取费标准。标底编制方法采用制造成本法.包括直接成本(人工、材料、机械费用成本)和间接成本,并在总成本上加上必要的加价,包括承包方的总部管理费、不可预见费、利润、税金等。人工、材料、机械消耗量应是本工程标所消耗的必要劳动量,可根据国家和行业部门颁发的现行预算定额确定;或根据工程实际情况计算所需资源的配置。标底工程量采用国家或行业标准计算确定。