说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 归档要求
1)  filing request
归档要求
2)  These need filing.
这些需要归档。
3)  document.tion Requirements Description (DRD)
文档要求说明书
4)  Repetitio rei
要求对物的归还
5)  filing [英]['faɪlɪŋ]  [美]['faɪlɪŋ]
归档
1.
The method and effect of filing management of nursing documents;
我院护理文件归档管理的方法与效果
2.
Primary Discussion on Filing Scientific and Technological Archives on Seismology;
浅谈地震科技档案的归档管理
3.
Further Discussion of Filing not just Belonging to Incoming Dispatches--Further Discussion with Comrade Li Xingli
再论归档不宜只归发文——与李兴利同志再探讨
6)  pigeonhole [英]['pidʒin,həul]  [美]['pɪdʒən,hol]
归档
1.
To solve the problems that the test results of inpatients can t be pigeonholed in their medical records immediately and completely.
针对住院病案中,检查结果不能及时、完全归档,随机抽取科室进行调研分析,原因多方面,主要有下发报告手续不够健全,网络化管理对纸质病案造成冲击等。
2.
Objective: Discussing the pigeonhole of medical records of the hospital and its impact on the quality of statistics data.
目的:探讨医院病案归档现状及其对统计信息质量的影响。
3.
The pigeonhole algorithm to files is put forward.
提出了文件归档算法,利用该算法完成了文档的自动或辅助归档。
补充资料:发包人要求承包人按时开工和按要求施工的权利
发包人要求承包人按时开工和按要求施工的权利:承包人应当按照合同的约定做好开工前的准备工作,负责作好施工场地的平整,施工界区内用水、用电、道路、以及临时设施的施工:编制施工组织设计或施工方案;按照约定作好材料和设备的采购、供应和管理;向发包人提供应由发包人供应的材料、设备的计划,承包人应按照合同约定的开工日期按时开工。在施工中,承包人须严格按照施工图及说明书进行施工,承包人不按照施工图和说明书施工而造成工程质量不符合合同约定条件的,应当负责无偿修理或者返工。《民法》第一版 第515页 魏振瀛 北京大学出版社
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条