说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 负荷评定
1)  load assessment
负荷评定
2)  Load evaluation
负荷评价
3)  load-set
负荷设定
4)  rated load
额定负荷
1.
In the event of reducting load in operation of ultra-supercritical units to 60% of their rated load, the specific heat consumption of said units will be lower than that of supercritical 600 MW units under rated operating condition; in case the.
超超临界机组运行负荷降低至60%额定负荷时,其热耗率将低于超临界600MW机组额定工况时的热耗率;超超临界机组负荷低于40%额定负荷时,其热耗率设计值将低于亚临界300MW、600MW机组额定工况时的热耗率;超超临界机组在低于60%额定负荷后,热耗率出现加速上升的趋势。
5)  determination of power load
负荷确定
1.
This paper briefly expounds the features of power consumption and determination of power loads in the housing colony, and introduces the connection mode of 10kV distribution system, the arrangement of power substation, the design of road and landscape illumination, the selection of conductor cross-section of low-voltage line and the laying of low-voltage line in the housing colony.
简述了小区用电特点及负荷确定 ,介绍了小区 10 k V配电系统的接线方式、小区内变 (配 )电所的设置、小区内道路及景观照明设计、小区内低压线路导线截面的选择以及小区内低压线路的敷
6)  ration load
定量负荷
补充资料:《房屋修缮工程质量检验评定标准》


《房屋修缮工程质量检验评定标准》


  《房屋修缮工程质量检验评定标准》中国建设部颁布的规章之一。房屋修缮施工单位对完成的工程项日,要根据《房屋修缮工程质量检验评定标准》评定质量等级.进行竣工验收,不合格的不准交工。在工程正式交验前应预检,对整个工程项目、设备运转情况及有关技术资料全面进行检查,对检查出的问题应做好记录,定期解决,然后才邀请发包、设计单位正式验收。竣工验收的依据一般应包括:工程合同、修缮设计或修缮方案,及有关图纸或技术说明、会审交底记录、设计变更鉴证、材料试验报告单、隐蔽工程验鉴记录、房屋设备安装试调和试压记录等技术资料。竣工交验标准是:全部完成合同及设计(方案)要求的工程内容,质量符合标准及设计(方案)要求;具备住用条件,门窗开闭灵活、严密,灯亮,水通,煤气通,烟道通,暖气热,装修设备完好,场地整洁,排水和道路畅通,余料弃土清理完毕;技术资料齐全、准确;作出质量评语,填写单位工程质量评定表;原有修缮设计图纸的工程,要提交竣工图。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条