1)  infiltrate
打入
2)  Hit into instrument
打入器
3)  driven pile
已打入桩
1.
Based on the theoretical analysis and the numerical simulation,the sheltering effect of previously driven piles on ground surface heave and lateral displacement of soft soil in pile driving is studied.
基于理论分析结果及有限元数值模拟,分析了打桩过程中软土中已打入桩对水平位移及地表隆起的遮拦作用。
4)  driven pile
打入桩
1.
Study on long-term settlement behavior of driven pile foundation in Shanghai soft soil area;
上海软土地区打入桩基长期沉降性状研究
2.
Nonlinear lateral vibration of driven pile;
打入桩的非线性侧向振动
3.
Based on long-term settlement monitoring data of driven pile and cast-in-place pile of large quantity of high-rise buildings in Shanghai, the comparison of construction period settlement and finally monitoring settlement for driven pile and cast-in-place pile were analyzed.
结合上海地区大量高层建筑打入桩基和钻孔桩基的长期沉降观测资料,对比分析软土地区打入桩基和钻孔桩基竣工沉降、最终沉降的大小,结果表明钻孔桩基的长期沉降特性明显优于打入桩基,并探讨了其机理。
5)  driven piles
打入桩
1.
A brief review is presented for the current state of knowledge of time effect on driven piles.
关于沉桩结束后打入桩承载力的时效性现象,目前已经开展大量的研究。
6)  pile driving
打入桩
1.
According to the analysis of the pile driving the estimating method of pore water pressure of soil in surrounded pile is obtained under the computing assumption condition.
通过对打入桩的分析,在简化假定条件下,提出了在饱和粘性土中打桩时桩周土中的孔隙水压力估算方法,实测资料验证是可行的。
参考词条
补充资料:50t炼钢电弧炉电抗器、电阻器(SVC)(大冶钢厂)


50t炼钢电弧炉电抗器、电阻器(SVC)(大冶钢厂)


50t炼钢电弧炉电抗器、电阻器(SVC)(大冶钢厂)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。