说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 建前
1)  before establishment
建前
2)  wave front reconstruction
波前重建
1.
Gabor s conception about wave front reconstruction of holography is discussed, and the wide application of holography is shown.
简述了伽柏为实现全息术所产生的“波前重建”的构想 ,并展示了激光全息术的广阔应用前
3)  wavefront construction
波前构建
1.
Ray tracing by implementing C++ language-based wavefront construction approach;
基于C++语言实现波前构建射线追踪
2.
On Some Computational Problems in Wavefront Construction Method
论波前构建法中的几个计算问题
3.
To overcome the problems of the interpolation of the velocity and velocity derivative on non-grid during wavefront construction,a more accurate interpolation algorithm,called bicubic convolution interpolation,has been presented.
针对波前构建法在实现波前射线路径追踪过程中所遇到的速度以及速度导数的插值问题,提出一种更精确的二维三次卷积插值算法,将该算法应用到波前构建法中,得到比较精确的射线路径。
4)  reconstruction of anterior chamber
前房重建
5)  front building of power plant
厂前建筑
6)  Prehistoric architecture
史前建筑
1.
Prehistoric architecture is the source of architecture, it s development exert a tremendous influence on later architecture.
史前建筑是建筑之源,其形成和发展过程对后代影响巨大。
补充资料:基本建设前期工作项目经理负责制
      重点项目建设前期工作的任务、内容、进度落实到项目经理的领导责任制度。这一制度是中国在1983年编制第六个五年计划建设项目前期工作计划和第七个五年计划重点项目前期工作计划时开始正式执行的。
  
  项目经理的主要职责是:①组织可行性研究报告和设计任务书的编制,对该项目在技术上是否先进、可行,经济上是否合理,资源是否可靠,产供销是否平衡,协作、配合条件是否落实,进行科学论证,为国家对该项目建设决策提供正确的依据;②组织或监督初步设计的编制,制订项目的前期工作计划,报主管部门审批后实施。项目经理的主要权力是:①挑选或聘请项目的总工程师和经济师作为助手,独立公正地进行技术和经济分析,制定方案,并对工作成果的科学性、准确性承担责任;②支配和调剂该项目前期工作的资金,参与主管部门解决该项目外部条件的工作;③建立前期工作的各种责任制。项目经理必须遵循的原则是:从实际出发,按基本建设程序办事,以提高经济效益为中心,在技术经济比选中,注意采用成熟的新技术、新工艺、新设备、新材料。
  
  项目经理一般从项目主管部门的司局长、总工程师、副总工程师,或从各省(市、自治区)主管该项目的厅局长、总工程师、副总工程师中挑选和任命。大型企业的技术改造项目经理,除在上列范围挑选外,也可由该企业的总工程师、副总工程师或副厂长担任。
  
  建立基本建设前期工作项目经理负责制,是由前期工作本身的技术和经济特点(时间长、环节多、工作量大、涉及面广、复杂性强)所决定的。实行项目经理负责制,有利于加强重点建设前期工作,明确责任,事有专责,避免决策失误,使每项工程都做到质量优、工期短、投资省、效益好。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条