您的位置:首页 -> 词典 -> 环境工程地质勘察
1)  enviromental engineering geological prospecting
环境工程地质勘察
2)  Environmental geological prospecting
环境地质勘察
3)  engineering geological investigation
工程地质勘察
1.
Analysis on several problems in engineering geological investigation for Yangtze dyke;
对长江堤防工程地质勘察几个问题的认识
2.
This paper suggest that the engineering geological investigation of shaft lining rupture can be divided as preliminary and detailed phases, the working contents and methods of each investigation phase is also put forward.
本文建议立井破裂工程地质勘察可划分为初步勘察和详细勘察两阶段 ,提出了各阶段应包含的具体工作内容和工作方法 ;特别是提出要进行模拟土与井壁相互作用试验 ,获得不同埋深土层与井壁相互作用的力学参数 ;提出在勘探阶段判断厚表土层中煤矿立井非采动破裂的系统工作方法。
3.
The engineering geological investigations for pipeline large/middle river crossing is one of the focal point and difficult point in pipeline engineering.
大中型河流管道穿越工程地质勘察是管道线路工程地质勘察的重点与难点之一。
4)  engineering geologic exploration
工程地质勘察
1.
Study on stability of earth crust in construction areas of important projects is one of the important contents of engineering geologic exploration in the early stage,and has attracted increasing attention from engineering circles.
重大工程区域地壳稳定性研究 ,是工程前期工程地质勘察的重要内容之一 ,并越来越多地为工程建设所重视。
2.
According to perennial experiences in engineering geologic exploration, safety appraisal and rehabilitation design to existed reservoirs, as a personnel in hydrotechnics field, the author has summarized some recurrent problems in reservoiT engineering geologic exploration.
笔者通过多年的已建水库工程水库勘察实践、水库安全鉴定和除险加固设计工作,从水工专业技术人员角度,总结了已建水库工程地质勘察常遇到的勘察阶段深度、地质勘探布孔及试验项目要求、试验数据的分析选取,特别是进行渗流计算时渗透系数的选取等问题,供同行们参考讨论。
5)  geological engineering exploration
工程地质勘察
1.
The roles of drilling technicians in geological engineering exploration are briefly stated.
简述钻探技术人员在工程地质勘察中的作用,除了做好本专业的工作之外,还要参与工程地质勘察费用预算、地质测绘与调查、图件绘制、报告编写,倡导工程钻探和工程地质学科交叉,提高勘察精度。
6)  engineering geological exploration
工程地质勘察
1.
The conclusions reached have some practical value and theoretical grounds, and hence are of referential significance in future engineering geophysical application to engineering geological exploration for the water pumping energy storage station.
笔者从地下地质工程和上水库工程地质调查这两个特殊问题论述了工程物探应用的对策和实效 ,具有一定的实用性和理论依据 ,对今后在抽水蓄能电站工程地质勘察中应用工程物探有一定的参考意义。
2.
The good effectiveness of the engineering geological exploration works has been achieved with small working quantity and in a short exploratory period.
介绍了昆明勘测设计研究院在景洪水电站建设中的工程地质勘察实践,总结了个人在工作过程中的一些体会和经验。
3.
The paper introduced sediment treatment in the 3# hole of west Qingling with depth of 850m in engineering geological exploration of Lanzhou-Chongqing railway,and summed up some treatment experience and measures in treatment of sediment in broken formation for the similar drilling failure.
介绍了兰渝铁路工程地质勘察孔深850 m的西秦岭3号孔沉渣处理过程,总结出一些在破碎地层沉渣事故处理的经验和措施,为类似事故提供借鉴。
补充资料:坝址工程地质勘察


坝址工程地质勘察
engineering geologic investigation for dam site

  bozh一gongeheng dlzh一korleho坝址工程地质勘察(engineering geologieinvestigation for dam site)为选择坝址和查明坝址工程地质条件所进行的综合调查工作。大坝是水电工程的主要建筑物,其规模、类型及型式的不同,对工程地质条件的要求也是不同的。另外,坝址除大坝外还有厂房、导流隧洞、泄洪隧洞、发电隧洞及溢洪道等其他建筑物。因此,坝址工程地质勘察不仅为大坝,同时还要为其他各种建筑物的设计和施工提供地质资料和工程地质评价。勘察工作是分阶段进行的,各阶段任务、内容、方法及成果是不同的。 勘察任务①规划勘察。主要是配合规划设计选择和确定建坝河段,调查各梯级坝段的工程地质条件,研究近期开发和控制性工程坝区的主要工程地质问题。②可行性研究勘察。在规划选定梯级的坝段,调查研究各比较坝址的工程地质条件,为选择坝址、初选基本坝型提供地质依据。③初步设计勘察。查明选定坝址的工程地质条件,为确定坝型、枢纽布置、坝线及地基处理方案提供地质资料。④技施设计勘察。进行工程地质专题研究.核实前期勘察资料及结论,为设计的调整和优化提供地质资料,并参加地基验收和处理的研究工作,提出施工、运行期地质监测的建议。 勘察内容①规划阶段。主要是了解坝段的河谷形态及地貌,出露地层和岩性及影响建坝的易溶岩、软岩(土)层的分布,构造断裂的发育程度、规模及其与河流方向的关系,岩体风化程度及特征,井、泉的分布及其与岩层、断裂、地貌的关系,河谷内坍滑体等的分布、规模及状态,大范围松散堆积物的来源,喀斯特形态、分布及与地貌、构造的关系,泥石流活动情况及形成条件等。②可行性研究阶段。是调查坝址的岩层分布及其物理力学性质,软弱岩层及夹层性状,各级断裂的分布及其组合,缓倾断裂的分布规律及性状,河床及两岸岩体风化带深度及卸荷范围,坝基岩体及断裂带的渗透性,相对隔水层埋藏深度,地下水类型、水位及动态,河床覆盖层厚度、结构及透水性.喀斯特发育规律,岸坡稳定条件等。③初步设计阶段。主要是查明坝址建筑物范围的覆盖层厚度、组成、渗透性、承载力、压缩变形、渗透比降及液化条件等,基岩的各向异性、变形特征及抗剪强度,软弱岩层或夹层的分布及物理力学性质,控制大坝稳定的断层的规模、产状及其空间变化规律,断层带物质的组成、性状、强度和水化学稳定性,岩体风化卸荷深度及渗透性,喀斯特发育深度,地下水埋深、动态、相对隔水层的埋藏条件,大坝下游抗力体及冲刷部位岩体性质、风化程度及完整性。上述研究内容可根据坝型及具体地质条件有所侧重。④技施设计阶段。