2) cross-Yellow River
穿黄河工程
1.
This thesis,by introducing the scheme demonstration and confirmation of cross-Yellow River project and the relative information of the probing hole,focuses on the key technique factors influencing the scheme selection of crossing on the Yellow River including the transfer scale,the design water level of the import and export,river regime,type of structure,tunnel diameter and project lay.
穿黄河工程是南水北调东线工程的关键性控制工程。
3) Yellow River crossing
黄河大跨越工程
6) the Yellow River system engineering
黄河系统工程
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)
坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle
一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条