说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 石化施工企业
1)  petrochemical construction enterprise
石化施工企业
1.
The paper introduces commitment contents in WTO rules related to petrochemical construction enterprises and analyzes effects of China s entry into WTO to our petrochemical construction enterprises.
介绍了WTO规则中与石化施工企业有关的对外承诺内容,分析了加入WTO对我国石化施工企业的影响。
2)  Petroleum Construction Enterprise
石油施工企业
1.
Reflection on Strengthening Project Item Management of Petroleum Construction Enterprise;
对加强石油施工企业工程项目管理的几点思考
2.
Fierce market competition must bring financial risks to petroleum construction enterprise,which is the problem we have to face.
在激烈的市场竞争中,石油施工企业的财务风险是客观存在的。
3)  construction enterprise
施工企业
1.
On production safety of building construction enterprise and its building safety management;
浅谈建筑施工企业安全生产及建筑安全管理
2.
Carrying out ISO14000, Establish Green Construction Enterprises;
推行ISO14000环境管理体系标准创建绿色施工企业
3.
The importance of engineering cost management in development of construction enterprises;
工程造价管理在建筑施工企业发展中的重要性
4)  constructing enterprises
施工企业
1.
Problems and measures of informational construction of constructing enterprises;
施工企业信息化建设面临的问题及对策
2.
Molding of constructing enterprises brand in residential real estate market;
住宅房地产市场施工企业品牌塑造
3.
Discussion on cost control and construction claims for constructing enterprises;
浅谈施工企业项目成本控制与施工索赔
5)  construction corporation
施工企业
1.
The Effect of Bill of Quantity Quotation System on Chinese Construction Corporations;
工程量清单计价方法对我国施工企业的影响
2.
Discuss about bid of construction corporation;
关于施工企业投标报价技巧的探讨
3.
The Study on Incentive and Constraint Mechanism of Construction Corporation Manager in Our Country;
我国施工企业项目经理激励约束机制研究
6)  construction company
施工企业
1.
The adventure and countermeasure that construction company faced;
施工企业面临的风险及对策
2.
An electric power construction company must control cost to optimize its profits and to survive and develop normally.
施工企业要想良好生存和发展,必须通过对项目施工成本控制来实现项目效益的最大化。
3.
This article analyses the construction company how to validate and control special process according to the ISO 9001 quality management system standard and its own character.
就施工企业的自身特点,结合ISO9001质量管理标准要求,具体分析了施工企业如何确认和控制特殊过程,并提出了具体的措施。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条