说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 受托资源
1)  commissioned resources
受托资源
1.
This paper proceeds with angle of resources,analyzes the resource concept is suffused with melting,discusses the relations between resource and accounting,concludes that accounting target is the course and result of commissioned resources.
本文从资源的角度入手,分析了资源概念泛化,探讨资源与会计之间的关系,认为会计对象是受托资源运动的过程和结果。
2)  qualification of trustee
受托人资格
3)  trustee investment
受托人投资
4)  resource-constrained
资源受限
1.
Particle swarm optimization for resource-constrained project scheduling problem;
粒子群优化在资源受限工程调度问题中的应用
2.
Ant colony and particle swarm optimization algorithm-based solution to multi-mode resource-constrained project scheduling problem;
蚁群-粒子群算法求解多模式资源受限项目调度问题
3.
The Resource-constrained R&G Project Scheduling Problem Based on Dynamic Multi-object Particle Swarm Optimization Algorithm;
基于动态多目标粒子群优化算法的资源受限研发项目进度
5)  resource constrained
资源受限
1.
Based on study of the shipment scheduling problem in product delivery system in a steel plant, a multiobjective resource constrained project scheduling model for this problem was built.
以某钢铁企业产成品发货系统中装船调度问题为背景 ,建立了产成品装船调度问题多目标资源受限工程调度的数学模型 ,结合遗传算法和模拟退火的特点 ,设计了求解该问题的多目标智能优化算法 ,对算法输出的近似非劣解集提出了评价方法 ,将此模型和算法应用于某钢铁企业的实际装船调度中 ,结果表明 ,实际调度计划或者是非劣解集中的一个解 ,或者在非劣解集中存在某一计划优于实际调度计划
2.
To deal with resource constrained stochastic job scheduling problem,a discrete-time job during distribution stochastic project scheduling problem subject to an incompatibility constraint and multiple renewable resource constraints is described by a discrete-time discrete-event dynamic system.
为解决资源受限条件下的随机工序调度问题,该文提出一种基于离散随机动态系统描述的加工时间离散随机分布且同时具有不兼容和多种可更新资源约束的资源受限项目调度模型,使得在满足资源约束和工序约束的前提下,总的平均加工时间最短。
3.
This paper deals with the multi mode multiple resource constrained project scheduling problem (MRCPSP),which is abstracted from modeling the formation process of virtual enterprises of agile manufacturing in the next century.
研究敏捷制造模式下 ,动态企业联盟的形成过程中出现的多模式资源受限项目调度问题 。
6)  managed resource
受管资源
1.
Based on OSI System Management Model and layered managed resources in TMIS net,we discussed the structures of LME and operation conditions of LME to MIB.
以OSI的系统管理模型框架为基础,从铁路运输管理信息系统TMIS网络受管资源的层次性出发,分析和讨论了层管理实体(LME)的结构以及LME对MIB的操作条件,从而给出了面向资源的网管模型的具体结构。
补充资料:森林资源(见世界森林资源、中国森林资源)


森林资源(见世界森林资源、中国森林资源)
forest resources

sen Iin ziyuon森林资源(forest resources)见世界森林资源、中国森林资源。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条