说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 风险损失处理
1)  risk loss handling
风险损失处理
2)  risk loss
风险损失
1.
A water transfer tunnel is used as an example to show how to calculate the risk loss caused by the structure fatigue.
在传统风险损失模型的基础上研究了由于损伤造成结构功能未充分发挥导致的风险损失,建立了包括损伤项在内的风险损失模型,是对传统风险损失模型的有益完善和补充。
2.
Start with risk probability and its correlation of construction contract, ABC classification is applied to determine risk grade and then the relevant risk countermeasures is worked out to reduce risk loss.
从工程承包的风险概率及相关性入手 ,运用 ABC分类法确定风险等级 ,设计了工程建设风险管理程序 ,进而制定相应的风险对策 ,以减少风险损失 。
3)  risk rate
风险损失率
1.
Left Deviation for the Measure of Risk Rate under Fuzzy Expected Profit Rate;
模糊预期收益率下风险损失率的左偏差度量
2.
Taking the anticipated profit rate and risk rate of portfolio as the objective function,the fuzzy model of portfolio and optimization problem are studied.
以证券组合的期望收益率及风险损失率为目标函数,研究了在这两个目标下证券投资组合的模糊模型及其优化问题,并利用S型隶属函数将模型转化为普通线性规划模型进行求解,最后给出了一个具体的例子来阐述方法的有效性。
4)  settlement of loss
损失处理
5)  risk treatment
风险处理
1.
Based on the understandings of natural hazards risk and concepts on risk,followed by principles of science,practice,universal and opening,the conceptual model for natural hazards risk management is built,consisting of risk identification,risk analysis,risk evaluation and risk treatment,which is c.
在认识自然灾害风险的特点和风险概念的基础上,本着科学与实用,通用与开放的原则,构建一个由风险鉴别、风险分析、风险评估和风险处理四个模块组成自然灾害风险管理模式,该模型具有灾害风险管理的基本思路和系统方法,能够为灾害风险管理提供行动指南。
2.
Risk analysis of the new metro line construction has been done by using risk analysis methods,and risk treatments are discussed.
后建地铁线路工程与先建线路相比具有较高的风险性,为了正确评价后建地铁工程中的风险点,通过风险辨识、风险估计、风险处理等分析流程,对后建地铁线路工程的风险提出相应的处理措施,以保证后建地铁线路工程的安全。
6)  reprocessing loss
后处理损失
补充资料:待处理固定资产损失
  企业在清查财产过程中发现的列支范围尚不明确或责任尚不明确的各种固定资产毁损或盘亏。在资产负债表中作为长期资产项目。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条