说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 最优检修计划
1)  optimal maintenance strategy
最优检修计划
2)  maintenance scheduling optimization
检修计划优化
1.
For solving the transmission-line maintenance scheduling optimization problem(TMSOP),the uncertainties of power system load,generator output,line failure rate and maintenance resource were analyzed.
针对输电线路检修计划优化问题(TMSOP),考虑负荷、发电机出力、线路故障率及检修资源的不确定性,建立基于期望值二层规划的优化模型。
3)  maintenance plan
检修计划
1.
This paper introduces maintenance system and conception for Siemens gas turbine,especially,the feature of maintenance and outage for Siemens E class gas turbine(SGT5-2000E),as well as the maintenance plan.
介绍了西门子燃气轮机维护和检修体系,重点阐述了E级燃气轮机SGT5—2000E机型的维护和检修特点,并对如何制定和实施检修计划详细说明。
2.
An introduction is made on the rule of fault and defects of electric equipment as well as the electric maintenance modes applied in current China,with emphasis put on the relevant conception of state maintenance,drafting and optimization of maintenance plan.
论述了电力设备故障和缺陷的规律以及目前我国电力检修的模式,讨论了状态检修的相关概念、检修计划的制定和优化,并展望了状态检修的发展趋势。
3.
This paper explains the theoretical viewpoint of reliability centered maintenance( RCM), briefs the working procedure of RCM implementation in power plant as well as how to determine the maintenance mode of equipment and the formulation method of maintenance plan based upon the failure modality, failure effect and failure conseqnence analyses.
阐述了以可靠性为中心的检修模式(RCM)理论观点,并介绍了电厂实施RCM的工作流程,以及如何根据故障模态、故障效应、故障后果分析来确定设备检修方式、制定检修计划的方法。
4)  maintenance schedule
检修计划
1.
Application of genetic algorithm to optimization to the maintenance schedule of rural power network;
遗传算法在农村电网检修计划优化中的应用
2.
At present,the analysis on the impact of device maintenance on power grid largely rest on qualitative ones and,in most degree,depend upon the experiences of maintenance technicians while making maintenance schedule.
在制定检修计划时检修设备对电网所造成的影响分析目前停留在定性分析上,很大程度上依赖于检修专工的工作经验。
3.
In current research on unit maintenance schedule, the focused problems are reliability and economic.
现有研究中,安排检修计划通常只考虑可靠性和经济性,而没有考虑计划的公平性,在市场环境下不易为发电厂商接受。
5)  maintenance scheduling
检修计划
1.
Studies on the management system of maintenance scheduling for power systems based on workflow;
基于工作流的电网检修计划管理系统研究
2.
Research and application of maintenance scheduling simulation system for distribution network;
配电网检修计划仿真系统研究与应用
3.
An Optimization Method for Maintenance Scheduling in Power Supply System Based on Integer Programming;
基于整数规划的供电系统检修计划优化方法
6)  maintenance scheduling
计划检修
1.
Generator maintenance scheduling used to prevent units aging, is important to ensure power system operating reliably.
发电机组的计划检修作为防止机组老化失效的主要方法,在确保电力系统可靠运行方面起着重要作用。
补充资料:发电系统检修计划优化


发电系统检修计划优化
optimization of gener-ating unit mainte-nance scheduling

fod一anx一tongJ旧nx一u]lhua youhuo发电系统检修计划优化(optimization ofgenerating unit maintenanee scheduling)发电系统中以系统可靠性或/和经济性为目标函数,并考虑实际中存在的约束条件后,对发电机组检修计划进行的安排。电力系统中由于发电机组检修使可用容t减小,对电力系统可靠性具有明显的影响。此外,电力部门每年用在机组检修的费用也非常庞大。因此,应该合理地安排检修计划。多年来不少研究人员从优化的角度进行了大t研究,已发表了多种优化检修计划的方法以适应系统发展规划和运行调度部门的偏要.这些方法大致可分为三类:①以系统备用容t作为判据的确定性方法,如等备用法;②以系统风险度作为判据的概率方法,如等风险度法.③以可靠性或/和经济性为目标函数的数学规划法。其中最常用的是等备用法和等风险度法。 等备用法安排检修计划时力求使全年内系统的备用容t接近相等,因此,目标函数为 △尸,“△几,i,j一1,…,t,…,T,i转j(1)式中△尸、为任一时段(如周、旬等)的系统净备用容量;T为一年划分的时段数。约束条件可分为三种:①时间约束,如机组一年的检修次数、持续时间、容许检修的期间等;②资源约束,如检修力量、主要器材及设备条件等;③环境约束,如水能利用情况、与电网检修的配合和用户负荷需量等因素。 等备用法由于简单直观易于实现,故自有电力系统以来沿用至今。但是,这种方法没有考虑机组和系统负荷的随机性质,因此,不能反映两个不同的系统即使具有相同的备用容量,可靠性也可能不同的情况。 等风险度法安排检修计划时力求使全年系统的风险度接近相等。因此,目标函数为 LOLE‘一LOLE,,i,]一1,…,t,…,T,i举少(2)式中LOLE,为任一时段的系统风险度(见发电系统可布性指标)。约束条件与等备用法相同。等风险度法应用检修机组的有效载荷容量(见发电机组有效载荷容1)代替它的额定容量来修正负荷曲线,各时段内变化的日负荷用发电系统等位负荷来代替,这些措施充分考虑了机组和系统可靠性的概率性质,克服了等备用法的缺点。因此,这种方法从20世纪70年代初期提出后,在电力部门(特别是规划设计部门)得到应用。 等备用法和等风险度法都可在计算机上实现,许多国家电力部门都研制有这方面的程序,一般都是用启发式方法进行优化。直接应用数学规划的优化方法(如整数规划法等),虽也见到了一些研究结果,但这种方法的局限性很大(如不易处理各种约束条件等),实际应用的很少。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条