1)  overseas power plant projects
海外电站工程
2)  foreign power plant project
国外电站工程
3)  oversea project
海外工程
1.
Combining with concrete project,it analyzes existing problems and countermeasures of the oversea building project management procedures control,points out measares to control construction procedures,and accumulates oversea project construction management experiences,so as to establish good image of Chinese enterprise in international project industry.
结合具体工程实例,分析了海外建筑工程项目管理进度控制中存在的问题及赶工措施,提出了具体的施工进度控制措施,积累了海外工程施工管理经验,以树立我国企业在国际工程界的良好形象。
4)  overseas project
海外工程
1.
In comparison with domestic engineering projects, the utilization of local resources of overseas project has a certain particularity because of remote distance and many changeable construction factors.
海外工程项目远离祖国,施工可变因素多,对当地资源的利用和国内工程比较具有一定的特殊性。
2.
Combining the construction of Constantine University Town in Algeria, the paper analyzes the particularity and advantage of applying Design-Build to the overseas project and elaborates on the risks the contractor will face about project design and on the precautionary measures they should adopt under the general contracting mode of Design-Build.
文章结合阿尔及利亚康斯坦丁大学城建设项目,论述在海外工程中采用设计施工总承包管理的特殊性及其优势,并详细阐述了承包商在设计阶段所面临的风险及应采取的预控措施。
3.
There are many characteristics, like big amount, more problems, language barrier, fierce competition, enormous risk, existing in overseas project.
海外工程具有金额大、问题多、语言不通、市场竞争激烈及潜伏风险较大等特点。
5)  power station project
电站工程
1.
The power station project has such character as long period for construction, completion with production, provision, and sale simultaneously, unavailable storage and regional power supply.
本论文选择了电站工程项目作为研究目标,力求利用项目管理的一般原理和方法从项目管理的角度来分析和研究如何对电站工程项目在工期、质量以及成本方面进行目标优化,探讨了“资源成本有限——工期最短”的优化方法,介绍了利用RSM(资源计划)方法确定项目的最短工期;同时分析了质量成本与收益的关系,并借助质量成本与收益曲线确定质量成本的最佳投入。
6)  hydropower station project
水电站工程
1.
On the basis of introduction of concept as well as methods of measurement of ecological integrity,effect of construction of Shuangxi hydropower station project on regional ecological integrity is expounded in the paper in terms of three aspects: productivity of natural system,state of stability of natural system,and quality of landscape ecosystem.
在介绍生态完整性的概念及其度量方法的基础上,从自然体系生产力、自然体系稳定状况与景观生态体系质量3个方面,阐述了双溪水电站工程建设对区域生态完整性产生的影响。
补充资料:黄河上最大的电站——龙羊峡电站


黄河上最大的电站——龙羊峡电站


  黄河上最大的电站——龙羊峡电站 贺建福撮
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条