说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> UICC分期
1)  92'Fuzhou staging system
UICC分期
2)  UICC combustion system
UICC燃烧系统
3)  flood season division
汛期分期
1.
Application research of the improved vector statistical method into the flood season division;
改进矢量统计法在汛期分期中应用研究
4)  flood season staging
汛期分期
1.
Reservoir flood season staging calculation is conducted based on annual maximum sampling and super-quantitative sampling through using vector statistics and relative frequency methods,and compared with other methods currently in use.
应用矢量统计法和相对频率法,基于年最大值取样以及超定量取样进行汛期分期计算,并与现有的方法进行比较研究。
2.
The research on flood season staging is the foundation of scheduling control on dynamic flood limit water level of power stations and reservoirs.
汛期分期研究是实现电站、水库动态汛限水位调度控制的基础。
5)  the division into two stages
中期分期
6)  division of flood season
汛期分期
补充资料:地理分期播种(见地理播种)


地理分期播种(见地理播种)


d 11bozhong粼龄燕羁见地理播种。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条