说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 武都重力坝
1)  Wudu gravity dam
武都重力坝
1.
Geological conditions of Wudu gravity dam is complex, there are natural slip pathway due to faults inclining in the upstream and downstream and many interformational disturbed belts.
武都重力坝地质条件复杂,坝基内存在贯通的倾向上游和下游的缓倾断层以及多条层间错动带,存在天然的滑移通道。
2)  Wudu Roller Compacted Concrete Gravity Dam
武都碾压混凝土重力坝
3)  mudoretic
武都力
1.
The Cost-benefit Evaluation Using Mudoretic to Treat Salt-sensitive Hypertension;
武都力治疗盐敏感性高血压性价比的评定
4)  abutment of gravity dam
重力坝坝肩
5)  gravity dam
重力坝
1.
Overloading failure simulation for Baozhusi gravity dam by improved composite element method;
宝珠寺重力坝超载破坏的改进复合单元法模拟
2.
Study on stability against deep sliding of gravity dam;
重力坝深层抗滑稳定计算探讨
3.
Anti-sliding stability analysis for deep and shallow layers of gravity dam of Xiangjiaba hydropower station;
向家坝水电站重力坝深浅层抗滑稳定分析
6)  gravity dams
重力坝
1.
A discrete crack model based on the extended finite element method(XFEM) was used to describe the nonlinear fracture of concrete gravity dams during earthquakes.
为了模拟重力坝在强震作用下的破坏过程,利用扩展有限元框架下的分离裂纹模型描述混凝土中的裂纹扩展。
补充资料:非溢流重力坝


非溢流重力坝
non-overflow gravity dam

  feiyiliu zhongliba非溢流重力坝(non一overflow gravitydam)坝顶不溢流的重力坝。各种型式的重力坝都可以建为非溢流坝。筑坝材料多用混凝土,中小型工程也可用浆砌块石。 在大多数重力坝枢纽中,于河床中部或主流部分布置溢流重力坝,两侧布置非溢流重力坝与岸坡相接,其间用边墩和导墙隔开(见重力坝图2)。少数工程,如中国刘家峡水电站,由于河谷狭窄,需布置电站厂房,岸边又有适宜条件布置溢洪道,经方案比较,设置了河岸式溢洪道,拦河坝全部为非溢流重力坝。非溢流重力坝可根据调洪预泄、放空水库、排沙等运用要求在坝身布置深式泄水孔。当有坝后厂房时,可穿过坝体布置发电引水管。 非溢流重力坝的坝体设有横缝、纵缝、止水、排水、廊道等(见坝体分缝、止水、坝内排水管、坝内廊道)。进行非溢流重力坝剖面设计时,常先拟定基本剖面,再根据运用和施工要求修改成为实用剖面(见重力坝剖面),然后进行详细的稳定和强度计算(见重力坝应力分析和重力坝抗滑稳定),根据计算结果再进行修正。为减小计算工作量,各国已编制了不少重力坝剖面优化程序,可用电算求解。剖面确定后,再进行分缝、止水、排水、廊道、坝内引水管、深式泄水孔等的设计和计算。对坝基稳定和处理应给予足够重视(见大坝岩基处理)。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条