说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 建设监理程序
1)  construction supervision procedures
建设监理程序
2)  construction supervision
建设工程监理
1.
Study on the development condition of Suzhou construction supervision industry and relevant suggestions;
苏州市建设工程监理行业发展现状分析及建议
2.
After analyzing the relationship between construction supervision and construction project management, this paper pointed out that changing into project management enterprise is an effective approach for supervision enterprise to promote its power and whole level.
通过对建设工程监理与建设工程项目管理关系的分析,指出了向项目管理企业转变是监理企业提升竞争平台、提高系统实力和整体水平的有效途径之一,并对监理企业如何向项目管理企业转变提出了建议。
3)  engineering construction supervision
工程建设监理
1.
The paper reviews three development stages of national engineering construction supervision,and analyses the three important problems in the process after joining into WTO.
文章回顾了我国工程建设监理经历的三个历史发展阶段,分析了加入WTO后,监理企业在发展中出现的三个关键性问题,并结合我国建筑业国情,针对问题提出相应的对策。
4)  project construction supervision system
工程建设监理制
5)  construction engineering supervision system
建设工程监理制
6)  project construction supervision
工程建设监理
1.
Bidding for project construction supervision is of a new business.
用投标方式取得工程建设监理任务是一项新型业务。
补充资料:城镇居民住宅建设用地审批程序


城镇居民住宅建设用地审批程序


【城镇居民住宅建设用地审批程序】城镇非农业户口居民因建筑住宅而需要使用集体所有土地的审批程序。一般审批程序为:1.城镇非农业户口居民建住宅需要使用集体所有土地的,应当经其所在单位或居民委员会同意后,向土地所在的农村集体经济组织或者村民委员会或者乡镇农民集体经济组织提出用地申请。2.用地审批。所要使用土地属于村民集体所有的,由村民代表会或者村民大会讨论通过,经乡镇人民政府审查同意后,报县人民政府批准;使用的土地属于乡镇农民集体所有的,由乡镇居民集体经济组织讨论通过,经乡镇人民政府审查同意后,报县级人民政府批准。3.用地申请批准后,用户应参照国家建设征用土地的标准向土地所有者支付土地补偿费和安置补助费。4.由乡土地管理人员划拨土地。住宅峻工验收后,颁发集体土地建设用地使用证。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条