说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 节点相关度
1)  Node Relevance
节点相关度
2)  Corresponding nodes
相关节点
3)  node link
节点关联度
1.
Through the definition of node link based on information centrality which Fortunato proposed and the selection of the clustering center and the clustering of the node according node link,the approach identified the network to k communities,then identified the ideally community structure according modularity.
算法基于Fortunato等人提出的边的信息中心度,定义了节点的关联度,并通过节点关联度矩阵来进行聚类中心的选择和节点聚类,从而将复杂网络划分成k个社团,然后通过模块度来确定网络理想的社团结构。
4)  node similarity
节点相似度
1.
To mitigate this problem, the concept of node similarity was proposed and used to fault-tolerant grid task scheduling algorithm.
针对这些问题,本文提出了节点相似度的概念和计算方法,并将其应用到容错网格调度算法中。
5)  bus load correlation
节点负荷相关性
1.
Based on the fuzzy C-means (FCM) clustering algorithm, a new method for probabilistic voltage stability evaluation considering bus load correlation and load forecasting uncertainty is presented in this paper via adopting the multi-dimension correlation sampling technique.
在对研究时段内多个负荷水平进行模糊C均值聚类的基础上,采用多维正态分布抽样技术,提出了一种同时计及节点负荷相关性和负荷预测不确定性的电压稳定概率评估方法。
6)  interdependent node
内部相关节点
补充资料:相关成本与非相关成本(relevantcostandirrelevantcost)
  成本按其发生是否与决策项目相关的分类。相关成本是指与制定决策方案有关的联影响的成本,例如当期是否接受一批订货,生产该批订货需要花费的各种成本,即为相关成本。如该批订货是一种特殊订货,即其价格低于以前生产这种产品的完全成本时,其相关成本就是生产该批产品的变动成本。如果生产该批订货需扩大生产能力时,相关成本就既包括生产的变动成本,还包括添置设备等所需的其他成本。机会成本、差量成本、现金支出成本、可避免成本等均属相关成本。

  非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条