说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 电力物资采购
1)  Electric material purchasing
电力物资采购
2)  procurement [英][prə'kjʊəmənt]  [美][prə'kjurmənt]
物资采购
1.
This paper expounds how the coal enterprise to do well the procurement and material supply management, which include the establishment of some systems related to the procurement management, supplier access and evaluation, computer-based management, and procurement information sharing.
论述了煤炭企业如何搞好物资采购及物资供应管理的问题,包括有关采购管理制度、供货商准入及评价制度、计算机管理和采购信息共享制度的建立。
2.
The procurement of material is the premise and foundation of production and management in a company.
物资采购是企业进行生产经营的前提和基础,加强物资采购管理,减少物资采购费用,提高物资采购质量,才能提高企业经济效益。
3.
By enforcing the management of process control for procurement at colleges,the author puts forward several effective measures to reduce the cost of procurement.
本文通过分析加强物资采购过程的控制,提出了降低物资采购成本的有效办法,阐述了防止商业贿赂行为的发生必须从制度上、思想上、监管上予以重视,确保采购物资的质优价廉。
3)  material purchasing
物资采购
1.
Research on value engineering in material purchasing of coal mine;
煤矿物资采购价值工程分析研究
2.
Strengthen material purchasing management to improve economic benefit;
加强物资采购管理 提高企业经济效益
3.
This paper probes into the problem of strengthening the logistic management of coal enterprise to reduce the cost of the raw coal from four aspects of the material purchasing, material consumption, material reserve and material recovery.
从物资采购、物资消耗、物资储备、物资回收4个方面探讨了加强煤炭企业的物流管理、降低原煤材料成本的问题。
4)  material procurement
物资采购
1.
Taking material procurement management for the first 400-inch self-elevating drilling rig in China as an example,the article analyzes the important role of procurement management in offshore engineering from the aspects of features of procurement and mode of procurement management.
文章以我国第一条“400英尺”自升式钻井平台的物资采购管理为例,从采购的特点、采购管理模式分析了物资采购管理在海洋工程中所起的重要作用。
2.
The necessity of promoting ISO 9000 to standardize power material procurement and the application of the standard in material procurement process are analyzed.
以规范电力物资采购管理为目的,分析推行ISO9000标准的必要性及在物资采购中的运用。
3.
The paper analyzes the causes of risks emerging in material procurement process and how to avoid these risks through effective prevention in specific economic activities:strengthening contract management,better awareness of risk prevention in material procurement in order to reduce costs and to maximize benefit of the business.
分析了物资采购过程中各种风险产生的原因,以及如何在具体经济活动中通过有效的预防手段,尽量避免这些风险,加强合同管理,提高物资采购风险防范意识,降低企业成本,使企业效益最大化。
5)  Material purchase
物资采购
1.
The research and realization of a new experiment material purchase mode;
实验物资采购管理新模式的研究及其实现方式
2.
Enforce the Supervising and Management to Do Well in the Work of the Universities Material Purchase;
加强监督管理 搞好高校物资采购工作
3.
Misunderstanding of Standardization ,Quality and Measurement in the Material Purchase;
物资采购中标准化、质量、计量工作的误区
6)  materials procurement
物资采购
1.
Research on EPC Equipment and Materials Procurement Planning in Power Engineering Project;
电力工程EPC模式下的物资采购策划研究
2.
This article analyzed the special points of the technical materials procurement of multi-campus university and recommended the way to construct supporting system for the procurement.
分析了多校区高校技术物资采购工作的特殊性,介绍了如何针对多校区的特点建设支撑体系的情况。
3.
This paper constructs a set of comprehensive evaluation targets system of the materials procurement with the method of non-serial multi-hierarchy objective rule,presents a quality control model and an objective function about this system by using model reference theory.
本文依据非序列多层次目标准则建立了物资采购综合评价指标体系,应用模型参考思想构建了物资采购综合评价指标体系的质量控制模型及其目标函数,按照采购项目管理的运作程序对各个阶段的采购质量做了相应的评价,最后运用实例对以上讨论进行了定量化的分析。
补充资料:电力系统电力平衡


电力系统电力平衡
power balance of electric power system

  d一onll xjtongd一onJ一Pingher飞g电力系统电力平衡(power ba一anee of eleetriepower system)电力系统中电源与负荷的平衡。根据预测的电力系统负荷来确定电力系统的发电容量。它是电源发展规划的组成部分。电力平衡的内容是:①工作容量计算;②备用容量计算;③水电平衡;④火电平衡。计算结果可用电力平衡表或电力平衡图表示。在编制电力平衡表的过程中,常常要做多个方案,反复平衡,才能得到预期的结果。 工作容t计算水电厂、火电厂工作容量分别计算。根据规划期内预测投产的水电厂的保证出力、强迫出力、预想出力及电力系统负荷曲线计算水电工作容量。系统负荷减去水电工作容量即为火电(包括核电)工作容量。(见电力系统工作容童) 备用容t计算用系数法或电力不足概率(LO-LP)计算出备用容量并在水、火电厂之间合理分配.求出水电备用容量及火电备用容量。(见电力系统备用容黄) 备用容量与工作容量之和是保证系统安全可靠和不间断供电所必需的容量,称之为必需容量。 水电平衡水电装机容量与必需容量之平衡。由于水电厂在某些情况下运行水头低于设计水头或其他原因,水电厂的最大出力(亦称预想出力)有时低于装机容量,装机容量与预想出力之差称为受阻容量。在进行水电平衡时,预想出力必须大于水电必需容量,两者之差称为空闲容量。在平衡时可能遇到如下两种情况:①空闲容量过大,此时需研究提高水电必需容量的可能性,如扩大联网或复核水电装机容量.研究减少水电装机容量的合理性;②空闲容量为负值.即必需容量大于预想出力,则应研究降低水电工作容量及备用容量的合理性,或研究扩大水电装机容量问题。 火电平衡火电装机容量与必需容量的平衡。在平衡时,火电受阻容量及退役容量应予以扣除。通过平衡,可以确定火电新增装机容量投产的进度。平衡结果应使火电保持盈余。但由于投资或其他原因的限制,无法增加足够的容量使火电保持平衡时,系统将发生缺电现象。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条