说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 全长工作面
1)  full-length working face
全长工作面
1.
According to the conditions of hard roof and hard coal, a mechanical model for the full-length working face is proposed, and it is considered that the main roof forms three block mutually hinged plate structure in the full-length model working face.
针对“两硬”条件大采高综采老项初次垮落的特点,建立全长工作面力学模型,提出沿工作面布置方向老顶形成“三”块相互铰接的薄板结构,解释全长工作面呈分段、分期、迁移来压的原因。
2)  working face length
工作面长度
1.
6-1 seam of Suancigou mine,the rational working face length and technology parameters of the full-seam mining for a 20 m very thick and medium hard seam by fully mechanized sublevel caving mining have been systematically studied by using numerical simulation based on the fracture effect of ground pressure to top coal.
针对酸刺沟煤矿6-1号煤层的具体条件,基于矿山压力对顶煤的压裂作用,运用数值模拟方法系统研究了综放全厚开采20 m特厚中硬煤层的合理工作面长度和工艺参数。
2.
Through a survey of 29 fully mechanised caving faces in China collieries,the paper systematically analysed geology,technology,economy factors to effect the working face length for fully mechanised caving mining.
通过对我国 2 9个局、矿综放面的调研 ,系统分析了影响综放工作面长度的地质、技术、经济因素 ,认为地质因素是基础 ,经济因素是目标 ,技术因素是手段。
3)  long-wall face
长壁工作面
1.
Based on underground pressure theory of thin plate roof in face and its observation for long-wall face of No.
根据采场薄板矿压理论计算预测的8号煤层长壁工作面顶板矿压观测,得出了8号煤层长壁工作面采场矿压规律,同时对8号煤层进行了直接顶分类和基本顶分级,为炉峪口煤矿8号长壁工作面顶板管理提供了科学依据。
4)  longwall face
长壁工作面
1.
Study on plate group mechanical model for main roof of longwall face;
长壁工作面采场围岩铰接薄板组力学模型研究
2.
Analysis of filling effect and filling ratio of backfill mining in longwall face
长壁工作面充填开采的充填比与充填效应分析
3.
The immediate roof and coal which support the main roof in a longwall face are regarded separately as elastic,elasto plastic,visco elastic and visco plastic foundation,and the main roof is regarded as an elastic plate.
首次将长壁工作面支承老顶的直接顶与煤层分别视为弹性、弹塑性、粘弹性及粘塑性基础,将老顶视为弹性薄板,亦即将老顶及其基础(直接顶与煤层)分别视为4种统一的空间结构模型,并采用薄板弯曲边界元法分别与弹性、弹塑性、粘弹性及粘塑性边界元法耦合,对前述空间模型进行了求解,结果表明:老顶断裂后,各断裂岩板之间仍处于联锁咬合状态,形成了咬合板结构;随着基础从弹性向粘塑性过渡,老顶的断裂位置与煤壁间的距离以及顶板下沉率将增加,而应力集中系数、初次来压动载系数、周期来压动载系数及老顶与基础系统的反弹量将减小。
5)  stope width
工作面斜长
1.
The delimiting method of the stope width under high-pressure aquifer;
高承压水上采煤工作面斜长的确定方法
6)  super long coal face
超长工作面
1.
The technology of super long coal face in three s.
本文通过理论研究及数值模拟,分析了三软煤层超长工作面顶板变形、采场顶板运动特性及支承压力分布规律,提出了三软煤层布置超长工作面的采场顶板控制关键技术。
补充资料:凹模、凸凹模工作型面加工工艺过程
1)备料。 n
    2)锻造。锻成长方形的坯料(每件留长工艺夹头)。 n
    3)热处理。退火。   n
    4)铣(刨)削。铣(刨)削六面成长方形模块。 n
    5)磨削。磨削上、下两端面及相邻两侧面,用90。角尺测量相邻两面的垂直度。 n
    6)钳工加工。用平板和划线盘按图划线,并打样冲眼;用钻头钻螺纹底孔;用圆柱销孔的预孔;用钻头钻挡料销让位孔;用钻头在中心处钻穿丝孔等;正、反面孔口倒角;凸凹模用钻头孔扩,保证刃口高度;攻螺纹;铰孔。n
  7)铣削。平口钳装夹工件;用的立铣刀铣削型孔至尺寸,保证深度。 n
   8)热处理。凹模工件淬硬至HRC60~64,凸凹模工件淬硬至HRC58~62。 n
   9)平磨。磨上、下两端面及相邻两侧面,用90。角尺测量相邻两面的垂直度至图要求;退磁。 n
   10)线切割。按图编制线切割程序,切割模型孔成形,留单面研磨余量0.005 mm。 n
   11)钳工加工。研光线切割面: n
   12)检验。 n复合冲裁模的装配应选择凸凹模作为装配基准件,先装下模部分,后装上模部分
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条