1)  installation
沉设
2)  reducing settlement design
减沉设计
1.
According to the importance of pile and raft foundation design in the high-rise building foundation,it introduces two methods about pile and raft foundation design,reducing settlement design and variable-rate leveling design,and represents their design principle,design content and steps,and good economic performance gaining in practical project.
针对高层建筑基础中桩筏基础设计的重要性,介绍了减沉设计与变刚度调平设计两种桩筏基础设计方法,详细阐述了二者的设计原理、设计内容及步骤,在实际工程中取得了良好的经济效益。
补充资料:设人
1.施于人﹐要求他人。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。