1)  transformer load test
带负荷试验
1.
To solve the problem the author designed a software for data analysis in transformer load test.
本文结合主变差动保护的不正确动作案例的原因分析,介绍了主变差动保护的原理性缺陷以及由此带来的带负荷试验难以正确判断的问题,并设计了一个主变差动保护带负荷试验分析软件以解决这一难题,目前该软件在电网中的应用良好。
2)  on loading
带负荷
1.
Examining technique of microprocessor based protection on loading;
微机保护带负荷检查方法
3)  on load
带负载
4)  load screwdown
带负荷压放
1.
It puts forward that in order to make the load screwdown electrode holder st real significance,we should make overall consideration and improve design level of the whole electrode system from the following fields,such as,insulation on gas and hydraulic pressure tubes,electrode shell,electrode holder,elec- trode screwdown equipments and gripping facil.
介绍了气、液压弹簧保压带负荷压放电极把持器在16。
5)  hot line maintenance
带负荷作业
6)  onload examination
带负荷检查
参考词条
补充资料:水轮发电机组带负荷试验


水轮发电机组带负荷试验
onload test of water turbine-generator set

shu一tun一fod旧n]lzu dol fuhe shlyon水轮发电机组带负荷试验water turbine一generator set)(onload test of水轮发电机组起动试运行中带负荷时机械和电气的试验工作。带负荷试验的目的是检验机组及其辅助设备在各种负荷工况下的运行情况,为机组投产发电做好准备。主要试验内容有主变压器升压及冲击合闸试验、甩负荷试验、低油压关闭导叶试验、发电机作调相运行试验、机组带负荷下调速系统和励磁装!的试验等。 主变压器升压及冲击合闸试脸一般水枪发电机都通过主变压器升压后与电力系统连接。主变压器第一次利用发电机升压可从零升起,在额定电压的25写、50%、75%、10。%下检查发电机电压设备和主变压器的情况,检查有无不正常的声音及异常现象。主变压器升压后情况正常,即可进行冲击合闸试验。冲击合闸试验的目的主要是检查差动保护装t是否能躲过冲击时的励磁涌流。冲击合闸最好在主变压器高压侧利用系统电压进行。此时主变压器低压侧与发电机断开。冲击合闸一般在额定电压下进行5次。 甩负荷试验甩负荷试验的目的是检查当机组甩负荷时,水轮机调速器和励磁调节器(见水轮发电机励滋)的动态特性和检验蜗壳压力上升率与转速上升率是否符合设计要求.甩负荷试验一般甩有功负荷。当机组带负荷运转突然甩掉负荷时,通过水枪机的水量保持不变,因而水轮机得到了过剩的力矩,此力矩使机组加速。机组转速升高后,调速器即迅速关闭导叶,减少进水盆,机组转速下降。导叶关闭时间愈短,机组转速上升愈小,蜗壳和压力管道中的压力上升愈大。因此,必须选择适当的导叶关闭时间,使蜗壳和压力管道的压力上升率和机组的转速上升率都不超过设计允许值。甩负荷试验分4个阶段进行,即分别按额定有功功率的25%、50%、75%、100%甩4次。对于并人电网的机组,甩负荷的方法是机组带上预定的负荷,跳开发电机断路器或主变压器高压侧断路器,突然将负荷甩掉,此时要记录机组的负荷、转速、蜗壳压力、顶盖及尾水管真空压力、导叶开度、接力器行程、各轴承温度、机组各部位的摆度和振动以及上下游水位等.不仅要记录甩负荷前后的数据,还要记录在甩负荷过程中出现的最大值。然后计算出蜗壳压力上升率、机组转速上升率和调速器的残留不平衡度.对于电力系统容量较小,甩系统负荷有困难的机组.往往采用水电阻器作负荷进行甩负荷试验。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。