说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 建设场地开发
1)  Site development
建设场地开发
2)  development and construction
开发建设
1.
Major environmental problems existed in development and construction of western Hunan area and management countermeasures;
湘西地区开发建设中的主要环境问题及保护对策
2.
A rustic opinion for prior period works of the local small sized hydropower project development and construction;
小水电项目开发建设前期工作刍议
3.
Thoughts on the development and construction of the irrigation area of Hongsipu;
对红寺堡灌区开发建设的几点思考
3)  development [英][dɪ'veləpmənt]  [美][dɪ'vɛləpmənt]
开发建设
1.
Planning of new area of Yangquan and construction of residential environment in development;
阳泉市新区规划与开发建设中人居环境的营建
2.
Exploration on the development and construction of Wenzhou district in Oujiang River Estuary
瓯江口温州区域开发建设的规划探索
3.
With the improvement of the diplomatic relations between China and Vietnam,the development of this water-way again catches the eye-ball of both countries because it has the advantages of high efficiency and low costs.
目前迎来了红河航运开发建设的良好发展机遇。
4)  Exploitation and construction
开发建设
1.
The Countermeasure Research of the SanSheng District s Exploitation and Construction in the Eastern Associate Center of the City;
东部城市副中心三圣片区开发建设研究与对策
2.
The author introduced Wusuli River National Forest Park tourism resources and proposed the principles of exploitation and construction of the park.
介绍了乌苏里江国家森林公园旅游资源概况 ,在确定公园开发建设原则的基础上 ,评价了公园的开发建设条件 ,并提出了公园开发建设措施。
5)  building and developing
建设开发
6)  construction site
建设场地
1.
Method and implementation of assessment on aseismic performace of construction sites;
建设场地抗震性能评价的方法与实践
2.
Based on statistical analysis of land demand in control of coal mining area and reconstruction of squatter settlement,this paper discussed social benefit of sinking area as construction site and introduced involved technical measure with examples.
在统计分析了沉陷区治理与棚户区改造工程对土地需求的基础上,论述了利用沉陷区作为建设场地的社会效益;阐述了在沉陷区有条件建造建筑物的技术保证措施及工程实例;同时对规模性利用沉陷区进行工程建设存在的一些问题进行了探讨。
3.
In recent years the work of “Five-accessible to (road, railway, communication, water and electric power) and one-leveling (construction site)” for the construction site becomes more and more important with continuous new construction and expansion of large power projects, which will directly effect on the proper starting of the following works and cost of the whole project.
近年,随着多项大型电力工程不断新建和扩建,建设场地的“五通一平”工作越来越重要,它将直接影响后 续工程的正常开工和整个工程的造价。
补充资料:城市建设综合开发
      对准备开发建设的城市用地统一进行城市基础设施和生产建设项目以及生活服务设施的建设。各种设施和建设项目的建设相互配合、前后衔接,可使城市建设取得较好的综合效益。中国《城市规划条例》第43条规定:"城市成片建设的地区,应当按照城市规划,实行综合开发,统一建设。"
  
  综合开发的主要方式有两种:一种是"用地开发",即根据城市规划,由市政府统一征地,然后由综合开发企业组织招标发包,承包单位负责进行勘测、设计、平整土地、并修建道路、给水、排水、供电、供气、供热、通信等基础设施工程。开发建设后的用地交付使用单位并收取城市用地综合开发费。另一种是"建设开发",即在用地开发的基础上,进一步统一建设住宅、公共建筑、园林绿地,以至通用厂房和企事业单位内部的公用设施等。建成后成套出售或出租这些建筑物,并按土地面积和基础设施水平,向使用单位收取综合开发费。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条